Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1387 of 1387

Capability to model water distribution network in ICM

Can the function of “ForceMain” in InfoWorks ICM be expanded so that ICM can model the water distribution network. Or the InfoWorks WS function be included in ICM. This is often a requirement when the recycled network and sewer network are to be m...
XJ Wang 8 months ago in InfoWorks ICM / Hydraulics 2 Will not implement

Change formatting of '2D level boundary below ground level' in the timestep log

Other warnings such as manhole shaft/chamber area occur with only one line of text with the '(and possibly others)' text. Could something similar be introduced for the '2D level boundary below ground level' warning in the timestep log? This warnin...
Tom Newman 11 months ago in InfoWorks ICM / Reporting 0 For Review

flash/locate

As in Arcmap, please include the ability to flash a selected object or via the object search. This is really useful, especially in large models, to quickly see where features are in relation to one another or in the context of the whole network.
Chris Brown over 1 year ago in InfoWorks ICM / Visualization 3 Already exists

More informative Analysis Error messages in InfoDrainage

A common error in InfoDrainage is "The analysis has encountered an error and has been stopped." with no additional troubleshooting guidance, or hints about where the error originated. See some of the typical causes here: It would be helpful to hav...
Daniel'le DeVoss 6 months ago in InfoDrainage / Auditing / Reviewing 2 Gathering support

NOAA Durations

InfoDrainage supports only a limited subset of NOAA Atlas 14 storm durations: 360 minutes (6 hours), 720 minutes (12 hours), 1440 minutes (24 hours), and 5760 minutes (4 days). However, NOAA Atlas 14 provides a broader range of precipitation durat...
Guest 8 months ago in InfoDrainage / Hydrology 0 For Review

ICM UPM tool - running all impact durations at the same time

For any CSO assessment we do, we always have to compare standards for all impact durations (1hr, 6hr, 24hr). We’ve found setting up the tool the exact same way 3 separate times, only selecting a different impact duration, very slow and inefficient...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Multiple return period hydrograph

Currently, InfoDrainage restricts each hydrograph to a single return period, which creates inefficiencies when analyzing stormwater systems across multiple design storms. To accommodate analyses for 2-, 10-, and 100-year events, for example, users...
Guest 8 months ago in InfoDrainage / Hydrology 0 For Review

Allow export of user flags via ruby

As a WaSC we hold our models in a central model library and need to ensure our default flags are utilised, and the descriptors are not amended. we have automated the comparison as far as possible but the flags within any new Db have to be manually...
Richard Robinson 11 months ago in InfoWorks ICM / Export Data 0 For Review

Run Ruby Exchange Scripts from UI

It would be useful to have an official mechanism for running an Exchange script from the UI. While it would be useful to have access to more Exchange methods in UI Ruby scripts, this could act as a stop-gap or cover other use cases where a method ...
Dave Watts about 1 year ago in InfoWorks WS Pro / Automation 0 In progress

Weir coefficients

Expand the allowable range of weir discharge coefficients in InfoDrainage and provide an optional depth–coefficient user defined table to improve modeling flexibility and accuracy. Weir discharge coefficients (English units) typically range betwee...
Guest 6 months ago in InfoDrainage / Hydraulics 0 For Review