Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 942 of 1442

Multiple Pipe Networks in One Phase

When exporting from Civil3D to InfoDrainage, if I have multiple pipe networks they all export in separate phases. It would be very helpful to be able to export multiple pipe networks into a single phase of InfoDrainage. This would improve useabili...
Guest 5 months ago in InfoDrainage / Civil3D Integration 2 Gathering support

Add ability to alter storm water control colours fo differing control types

Add ability to alter storm water control colours fo differing control types. i.e. Attenuation Tanks = Blue, Bioretention = Green, Permeable Paving = Yellow etc. At present all controls are orange by default. It would aid visualisation.
David Williams 5 months ago in InfoDrainage / Visualization 0 Gathering support

Fix EGL display in LS view

When displaying EGL lines in the long section view, EGL is frequently shown to increase across manholes in the downstream direction (and direction of flow). This should not occur as (excluding pumps) if energy was really is higher on the downstrea...
Haddon Smith 11 months ago in InfoWorks ICM / Visualization 2 Already exists

Enable flood "section view" without DEM and improve ground model representation

Would be nice if you could just the ICM "New section view" tool used for view flood results without a DEM loaded on to the screen - the tool is still useful with a DEM as can view the mesh level and flood level. Sometimes I want to use this tool b...
Haddon Smith 11 months ago in InfoWorks ICM / Visualization 1 Will not implement

dendric numbering and table of results

its frustrating when interrogating and amending the pipe network, when the pipes and chambers are not in the same order, the way it was presented in MicroDrainage gave a clear path with the final outfall pipe being at the bottom, not randomly plac...
Steven Gilchrist almost 3 years ago in InfoDrainage / Reporting 1 Under consideration

Apply RTC / observed values to Sluice Linear Structures

At the moment we cannot move sluice linear structures in 2D. We're wanting to model a river entirely in 2D but the river is subject to a series of barrages that would require control. Therefore it would be essential to apply RTC and observed setti...
Richard Body about 6 years ago in InfoWorks ICM / River Modeling / RTC 0 Gathering support

Enable the ability to review Debug Logs from external text editor

The internal Log results editor window is slow when loading over 100K lines. Needless to say - debugging a model where the debug log is 11 GB cant be done in the product, and the workflow to export to file is simply excruciatingly painful. As the ...
Guest over 2 years ago in InfoWorks ICM / Productivity 1 Gathering support

As a user, I need to burn the 1D river into ground model, so the flooding extent inside the 1D river channel is shown accurately

HEC-RAS has a tool in RAS Mapper doing just that. https://www.kleinschmidtgroup.com/ras-post/including-channel-bathymetry-into-your-terrain/
Guest over 5 years ago in InfoWorks ICM / Terrain 2 Gathering support

GPU for 2D Erosion Deposition Model

The 2D erosion-deposition model can only be simulated on the CPU. For 2D rain-on-mesh models with GPU simulation times spanning hours, it becomes impractical to integrate the 2D erosion-deposition model, as CPU simulation times would extend into d...
Daniel Fensom over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Allow Simulation Time and Reporting Time to set independently

Similar to the functionality available InfoWSWMM where you are able to define a start date and time for the simulation and a start date and time for results. This allows initial phases of the model simulation to be ignored by the results without n...
Guest almost 2 years ago in InfoWorks ICM / Simulations 2 Gathering support