Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 383 of 1442

Non-circular pipes

Please add non-circular pipes to InfoDrainage, similar to those available SSA. These need the ability to connect to manholes at either end at a minimum, but the option to be culverted as well is welcomed.
Guest about 1 year ago in InfoDrainage / Hydraulics 1 For Review

Pipe names missing in export from Civil3D

When exporting pipes from Civil3D to Infodrainage, the pipe names keep reverting to the autogenerated names given when pipe is created in Civil3D even though they were renamed in Civil3D.
Jenna Woyner about 2 years ago in InfoDrainage / Civil3D Integration 1 Under consideration

Sort and collapse all option in flowpath Network Design Report

It would be useful to be able to ‘collapse all’ for branches in the Network Design Report. It would also be useful to be able to sort the connections (and junctions) in order of upstream→downstream or alpha/numeric. At the moment it seems rather a...
Matthew Johnson over 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Data Exchange for Revit

It would be useful to provide a seamless data exchange with other Autodesk products rather than just C3D - specifically Revit. On an architectural scale project, we often dont use a package like Civil 3D so being able to carry out drainage design ...
matthew.piggott 8 months ago in InfoDrainage / Data Exchange 0 For Review

Liquid filled/Flooded drainage network

Liquid filled/Flooded drainage network- the system should be required to design flooded drainage network i.e. drainage pipe should be always filled with liquid for entire length up to the discharge point. Like a surcharge up to manhole cover (liqu...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Multiple return period hydrograph

Currently, InfoDrainage restricts each hydrograph to a single return period, which creates inefficiencies when analyzing stormwater systems across multiple design storms. To accommodate analyses for 2-, 10-, and 100-year events, for example, users...
Guest 11 months ago in InfoDrainage / Hydrology 0 For Review

Modelling intermediate check dams and weirs in open channels including ponds ands swales

Currently, InfoDrainage only allows modeling of check dams or weirs at outlets. For open channels with multiple intermediate check dams, users must split the channel into sections, each with its own outfall defined. A more accurate feature allowin...
Dilraj KT over 2 years ago in InfoDrainage / Hydraulics 1 Gathering support

Button: Apply to all phases

To each of the build screens, next to "apply", add another button, "apply to all phases". This would save a lot of time when making tweaks to models for which more than one phase is being run (which is most models)
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Provide Enhanced Manhole Schedule Details

It would be great to have the option of providing an additional level of customisable detail which could be configured on MH Schedules. As an example including practical details around the cover – contractors want to know and see more from a MH s...
Guest over 3 years ago in InfoDrainage 1 Gathering support

Pipe clash detection when foul network phase is active

When working through clashes between surface water and foul networks, you can only access the pipe clash analysis within surface water analysis tab. This means if I want to change the depth of the foul network to avoid the clash then I have to swa...
Henry Wilkinson 11 months ago in InfoDrainage / Productivity 1 For Review