Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 1067 of 1442

Can the simulation log file be broken up into sections

Can the simulation log file be broken up into sections, as models get bigger and many with several 2d zone trying to find what is actual causing a simulations failure is becoming a bit more difficult having to scroll through big log files for that...
Bob Fleming over 5 years ago in InfoWorks ICM / Errors / Reporting 0 Gathering support

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam almost 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub almost 2 years ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

Allow Theming Inflow areas by attributes

I would like to visually theme the Inflow areas by an attribute, say, Percent Impervious (PIMP)
Guest over 3 years ago in InfoWorks ICM / Theme / Visualization 0 Gathering support

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott almost 2 years ago in InfoDrainage / Rainfall 1 For Review

Option to pan through 2 or multiple geoplans at the same time

Sometimes (in ICM and IAM) in comparing 2 (or more) networks visually the networks are most of the time tiled horizontally of vertically. But when panning through one network, it would be very convenient that the other network(s) is/are also movin...
Guest over 5 years ago in InfoWorks ICM / Productivity 0 Gathering support

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing almost 2 years ago in InfoDrainage / Reporting 3 Already exists

Report InfoSWMM available capacity against theoretical flow for specified d/D

InfoSWMM provides Pipe/Conduit summary report with values for Max flow divided by "Full Flow". Here the "full flow" is based on Manning's equation for when the pipe is full. However as a sewer utility, we're not allowed to fill pipes. We must keep...
Guest over 5 years ago in InfoWorks ICM / Grids / Reporting 2 Gathering support

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest almost 2 years ago in InfoDrainage / Visualization 1 Gathering support

Consistency in Plots Titles for Simulation and Live Data Plot Reports

Consistency in Plots Titles for Simulation and Live Data Plot Reports In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011” C...
Guest over 5 years ago in InfoWorks WS Pro / Other 0 Gathering support