Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 1067 of 1442

Enable 3d view of two phases (foul and surface) simultaneously to help resolve clashes found in clash analysis.

Clash Analysis identifies pipes touching, which may be in different phases. The ability to view both phases in 3D View (as you can in Plan View) would make resolving the clashes much more efficient.
Guest over 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Run same return period with multiple climate change allowances

When running the simulation wizard I would like to be able to run the same return period with multiple climate change allowances to enable a single analysis covering all scenarios. This will avoid needing to adjust inputs & rerunning the netwo...
Guest over 3 years ago in InfoDrainage 1 Already exists

Export functionality for SWMM objects in database tree

Be able to right-click on SWMM objects (SWMM time patterns, SWMM climatology, SWMM pollutograph) and export to CSV as you can with InfoWorks objects.
Guest about 1 year ago in InfoWorks ICM / Export Data 1 For Review

Automatically clean completed items from Job Control window

When using InfoWorks ICM across a workgroup server, all the simulations are visible by all users in the job control window. To keep the list manageable this requires each individual user to remember to click remove completed jobs regularly. As lon...
Tom Walker almost 2 years ago in InfoWorks ICM / Results 2 Already exists

flash/locate

As in Arcmap, please include the ability to flash a selected object or via the object search. This is really useful, especially in large models, to quickly see where features are in relation to one another or in the context of the whole network.
Chris Brown almost 2 years ago in InfoWorks ICM / Visualization 3 Already exists

More flexibility for pdm runs

We would like to be able to simulate warmup and hydraulic simulations with different input sources. Now the run crashes if for example rainfall data does not match the saved state of the warmup run. It would also be very useful to make it possible...
Guest about 3 years ago in InfoWorks ICM / Hydrology 0 Gathering support

Better functionality for multiruns

- number episodes in episode collection - sort runs according to number - greater timesteps for runoff only runs - resume with next run if a run fails - easy export of maximum results of runs (without results of the runoff only runs)
Guest about 3 years ago in InfoWorks ICM / Simulations 0 Gathering support

Go To button to zoom to a certain pipe from the Connection table

In Civil 3D you can zoom to/select a pipe from the pipe table. It is very difficult to find specific pipes in InfoDrainage.
Daniel'le DeVoss about 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Retain company logo in Hard Copy Headings

Company logo/attached image currently disappears from Hard Copy Headings after closing and reopening InfoDrainage. Other headings are retained. The image should also be retained when the file is reopened.
Daniel'le DeVoss almost 2 years ago in InfoDrainage / Reporting 2 Gathering support

Bioretention Underdrain Slope / Additional layer Options

Virginia specifications for a bioretention requires the underdrain to have a slope to it, but Infodrainage slope does not allow for this in the SWC bioretention SWC. Also, we sometimes have to place the underdrains in a trench below the storage la...
Jenna Woyner about 2 years ago in InfoDrainage / Hydrology 2 Already exists