Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 1067 of 1442

Better scenario comparison tools

Comparing changes/differences between scenarios is a chore as it can only be done via manually checking objects or looking through a text file showing the differences. I recommend 2 improvements. 1) be able to see different scenario attributes sid...
Andrew Sherson 11 months ago in InfoWorks ICM / Tree View 3 Gathering support

Amend & Simplify Report /Print Outputs

Would be useful to be able to fully customize the printed report outputs i.e. remove inlet, outlet information from controls, remove SuDS icons, remove unused or unimportant colums from results tables. It would also be good to be able to resize co...
David Williams over 1 year ago in InfoDrainage / Reporting 1 Under consideration

Convert 3d points from Civil 3D to cross section lines

River survey sections are provided as 3d points in a DWG file. These need to be converted to channel sections which needs to be done manually. There was previously a feature in RS that allowed the conversion.
Sophia Buchanan about 2 years ago in InfoWorks ICM / Import data 0 Gathering support

Update Database command accessibility

I recommend reviewing the placement, accessibility and prompts to ‘Update a database’ . The onset of backwards compatibility within software versions is resulting in unintended database updates. It would be beneficial to explore ways to make the ‘...
Andy Power 3 months ago in InfoWorks ICM / Workgroup 0 For Review

Pump and Valve symbol that indicates direction

The default symbols for Pumps and Valves should ideally indicate the direction they're pointing. This should involve dynamic symbol rotation based on connected pipes (not results). That way I can visually validate my data before running the model....
Nathan Gerdts 5 months ago in InfoWater Pro / Productivity 0 In progress

Expand gauged object results to all result fields

Currently the gauged object result fields are limited. For instance, they do not include 2d related results at nodes. As the use case for ICM has expanded so has the information that users are interested in. No longer as they just looked at 'flow ...
Alex Grist over 1 year ago in InfoWorks ICM / Results 3 Under consideration

Improved scenario organization

Can we have the scenarios functionality improved to allow for scenarios to be organized into folders, ordered by various attributes (other than time of creation) and a search function within the scenario window. It would be useful to have the fold...
Guest over 2 years ago in InfoWorks WS Pro / Engine 3 In progress

Changes to a network do not propagate downstream

If you change a pipe diameter or gradient, it will not accommodate these changes in the downstream section of the network. For example upsizing and steepening a pipe in the middle of a run will mean the next pipeis undersized and goes uphill. It a...
Matthew Johnson over 1 year ago in InfoDrainage / Hydraulics 1 For Review

Ability to draw, mark and add comments in the GeoPlan

I am not sure if this is currently an option that I just cant find but I thought it would be a great idea if users are able to markup and add comments to the GeoPlan. This would help with demonstrating conditions in a model in meetings and trainin...
Guest about 1 month ago in InfoWorks ICM / Other 2 For Review

Cancel graphs early

Add the ability to cancel out of loading a graph of observed vs predicted if it is taking too long. Particularly a problem with large run results or large observed datasets such as SCADA raw data. Can freeze the software for a very, very long time...
Guest 7 months ago in InfoWorks ICM / Calibration 2 Gathering support