Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 552 of 1370

Better functionality for multiruns

- number episodes in episode collection - sort runs according to number - greater timesteps for runoff only runs - resume with next run if a run fails - easy export of maximum results of runs (without results of the runoff only runs)
Guest almost 3 years ago in InfoWorks ICM / Simulations 0 Gathering support

Automated Calibration Tool

Tool similar to competing software where you can apply a level (%) of uncertainty and automatically sun simulations with varied parameters withing that level of uncertainty and see all results at once.
Guest over 5 years ago in InfoWorks ICM / Calibration 2 Gathering support

Modify Peaking Constant/Shape Factor in SCS Routing Model

There isn't a good way to modify the peaking constant also referred to at the shape factor for developing an SCS hydrograph in ICM networks. The most common is 484 which is the constant used in an ICM network, but there are occasional needs to mod...
Ryan Brown over 1 year ago in InfoWorks ICM / Hydrology 5 Under consideration

Allow for the running of statistics templates and generation of grid reports such as RPA and worst case using ICM Exchange

No description provided
Guest over 5 years ago in InfoWorks ICM / API / Exchange / Productivity / Results 0 Gathering support

Possibility to turn off report windows

Now, when updating elements from ground model, extending cross sections, inserting an opening in a bridge… a report is displayed. This can be very annoying when building up a model and you have to click the report windows away. It would be useful ...
Guest almost 3 years ago in InfoWorks ICM / Mesh / Productivity 2 Gathering support

Include regulator state in graph reports

this can only be done with custom graphs, would be easier in standard graphs for run comparison
Guest almost 3 years ago in InfoWorks ICM / Results 0 Gathering support

Results management - be able to see the size of sim results before they are downloaded from the cloud

It would offer additional, useful functionality if the user could see the size (MB/GB) of results files BEFORE downloading them locally. This could be shown via the log file, PRN, Results management, simulation properties, or all of the above. Any...
Saul Bradford almost 2 years ago in InfoWorks ICM / Results 2 Gathering support

Capability to restore multiple pruned links

It is cumbersome to restore pruned links one at a time if many assets need to be restored. The ability to restore a selection of pruned links and/or all pruned links would be helpful.
Guest over 1 year ago in InfoWorks ICM / Network 2 Gathering support

Pump Station Operation Narrative

Would like the ability to add a pump station narrative. For example, a station may have several pumps and varying set points, however those set points do not relate to a specific pump. The station may operate where once the first set point is reac...
Dave White about 1 year ago in InfoWorks ICM / Pumps 0 For Review

Resolving import errors for level events containing non-ASCII characters

When importing a generic CSV file containing non-ASCII characters (such as Japanese) as level events, double quotation marks ("") are added to the profile name. As a result, it no longer matches the outfall node ID, and the level is not applied co...
Yota Machii 6 months ago in InfoWorks ICM / Import data 1 Already exists