Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 137 of 1370

Statistic Report Enhancement

Provide a way to enhance the statistical report to allow specific criteria above a threshold.
Guest about 6 years ago in InfoWorks ICM / Reporting / Statistics 0 Gathering support

Report showing history of simulation jobs running on server over a period of time

We are aware that ICM simulation jobs that are currently running on a simulation server can be viewed in the agent.state file in D:\Innovyze\InfoWorksAgent on the server. It would be great if there were a report that could show the history of ...
Mark Huxtable over 1 year ago in InfoWorks ICM / Statistics 0 Gathering support

Allow Theming Inflow areas by attributes

I would like to visually theme the Inflow areas by an attribute, say, Percent Impervious (PIMP)
Guest over 3 years ago in InfoWorks ICM / Theme / Visualization 0 Gathering support

Export both the result and the underlying property fields

When the model results are displayed on the webpage through Exchange, since the basic properties need to be viewed, the corresponding basic properties of the results need to be exported first, and then the results are matched to the basic properti...
Liu Qiusheng almost 5 years ago in InfoWorks ICM / Export Data / Simulations 0 Gathering support

Convergence Errors be resolved automatically while the model is simulated

Sometime a TSR running for few weeks throws up convergence hence these sims need to be rerun with shorter timestep which is both inefficient and a lot of time is wasted. It would be good if somehow the simulations dialog allowed to run the model w...
Salam Jamadar almost 5 years ago in InfoWorks ICM / Performance / Simulations 0 Gathering support

Document how results pfc vs r.pfc are calculated for open channels

in the long plots we ask for two capacities, we get pfc vs r.pfc for pipes they are the same , but for open channels such a trapezoidal they are different. there seems to be no literature on this.
John Krpan over 1 year ago in InfoWorks ICM / Results 3 Will not implement

Visibility by system type

It would be usefull to have the possibility to easily switch on and off the layers of different system types by ticking on and of the different types/layers in the Geoplan Layers and Themes. By using the themes and adding visibility it is possib...
Richard Wilbrink over 3 years ago in InfoWorks ICM / GIS Layers 3 Gathering support

Theme mapping for rain gauges boundary lines generated using Thiessen polygons method

Boundary lines generated with the Thiessen Polygon methodology to define the boundaries for different rain gauges are too thin when they are automatically generated inside ICM. This make them quite difficult to see when a model is loaded with many...
Guest over 3 years ago in InfoWorks ICM / Rainfall / Theme / Visualization 0 Gathering support

Auto-space custom labels

We use custom labels a lot in reporting how we model ancillaries, and for complex assets spend a long time adjusting labels so they don't overlap and do show up properly. It would be great if a more "smart" label engine could be used so that label...
Oliver Perkins over 5 years ago in InfoWorks ICM / Labels / Visualization 0 Gathering support

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward about 2 years ago in InfoWorks ICM / Results 2 Already exists