Showing 338 of 1370

Exclude specific elements from Numbering Scheme (flow paths, manholes, simple junctions, etc).

Be able to have only manholes in the manhole schedule, without any missing manhole numbers. Junctions can be named separately and not included. Enable large sites with multiple areas to have their different areas named a different way easier.
Guest over 1 year ago in InfoDrainage / Auditing / Reviewing 2 Gathering support

Update downstream pipes

It would be useful to have an option to upsize downstream pipes automatically (just like microdrainage). For example, if i increase pipe size the corresponding downstream pipes should upsize accordingly so not to cause a restriction. At the minute...
Guest over 2 years ago in InfoDrainage / Productivity 2 Already exists

Modelling of mud and other non-Newtonian flows

We've a lot of work at the moment modelling the failure of tailings dams. Tailings dams typically have material that acts in a non-Newtonian manner. To effectively model these sorts of fluids would require the inclusion of additional fluid propert...
Richard Body almost 6 years ago in InfoWorks ICM / Hydraulics / Sediment 0 Gathering support

Call the 'Total storage calculation' function from a ruby script and write the output into a csv-file

It would be a great feature to call the 'Total storage calculation' function from a ruby script and write the output into a csv-file. If it is not possible to call the build-In function from ruby, it would also help to call the 'storage calculat...
Guest about 4 years ago in InfoWorks ICM / API / Exchange / Export Data / Ponds/Storage 0 Gathering support

Export river cross sections for an ICM model

At present, ICM river cross sections can only be exported to dwg one by one. It would be helpful to be able to export all the modelled cross sections in a single operation (eg via data export centre)
Guest over 4 years ago in InfoWorks ICM / Export Data / River Modeling 1 Already exists

Allow underdrains to be displayed in the connection tables and add pipe number to them

It is very difficult to create a quick and logical pipe schedule when pipes such as underdrains are hidden in the SuDS nodes and their upstream invert level needs to be calculated manually. Please add the underdrains to the connection tables with ...
Iwona Savas 11 months ago in InfoDrainage 0 For Review

Add SWMM5 Ideal Pump to InfoWorks ICM

Does InfoWorks ICM have an equivalent to an ideal pump in SWMM which pumps whatever is entering the SPS out of the SPS? It would be a good feature to include into infoworks as I needed to play around a bit to get it. I found I had to add line 2 ...
Guest about 6 years ago in InfoWorks ICM / Hydraulics / Pumps 1 Gathering support

Infiltration Trench using BRE DIGEST 365 method

The software needs to support for designing Infiltration trench method by using “BRE DIGEST 365”. I have checked the comparison between Infodrainage analysis Vs BRE digest 365 (manual calculation) and the results are not matching. Most of the proj...
Guest almost 2 years ago in InfoDrainage / Hydraulics 8 Gathering support

Swale with pipe under connected by manholes

Could not model real-life scenario where the pipe was under as conveyance for lesser events and raised via vented manholes into the swale above. Need integrated solution and was unable to model both and connect via manholes.
Guest almost 2 years ago in InfoDrainage / Hydraulics 1 Already exists

Include a new conduit type for tile drains

Add a new conduit type to model tile drains or underdrains. These are common in agricultural fields and certain stormwater control structures. Currently, its difficult to model these since you can't account for the time it takes to infiltrate from...
Ryan Brown almost 3 years ago in InfoWorks ICM / Hydraulics 0 Gathering support