Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 33 of 1370

Use tracers for water on mesh elements

Our clients are more and more trying to figure out if damage to a property is caused by water from the public area (which is the responsibility of the client) or from private areas (which is not). When rainfall on mesh can pick up a tracer (eg. fr...
Marcel Glasbergen over 3 years ago in InfoWorks ICM / 2D Flooding / Visualization / Water Quality 1 Gathering support

Design ARV & Washout size - Simulate losses & airflow during system drain down

As a planning and design team, we need to size air valves and wash outs for our system so that large pipes can be drained for maintenance in a timely manner. InfoWorks WS Pro models the draindown of water after isolation, but it doesn't take into ...
Nathan Gerdts about 2 months ago in InfoWorks WS Pro / Operations 0 For Review

Adding Level 2 water quality capabilities to the ICM UPM tool

The current UPM tool only allows for completion of level 1 water quality impact assessments. We believe that our assessments would benefit greatly by having the additional functionality to complete level 2 water quality impact assessments. This me...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Increasing speed of UPM water quality tool

As part of SOAF, we are required to run CSO water quality analyses using 10-year simulations. Using these outputs in the UPM tool often takes a long time. Whilst the tool is running, the modeller cannot use ICM for completing other tasks. We have ...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Adding Copy&Paste functionalities to the ICM UPM tool outputs

We would like to be able to easily copy paste the summarised results given by the UPM tool. We currently have to manually copy these results into excel which is prone to human error.
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Updating the water quality UPM tool to be compliant with the 3rd edition of the UPM manual for Level 1 water quality analysis.

Updating the water quality UPM tool to be compliant with the 3rd edition of the UPM manual for Level 1 water quality analysis. This includes: Removing the dependency of exceedances in a river on spill duration. This would provide a more robust app...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Adding Level 3/4 water quality processing to the ICM upm tool.

For future catchment studies, we are looking at completing higher levels of water quality impact assessment, Level 3/Level 4. For this we would like the UPM tool to be able to integrate ICM river models to represent river flows and river quality a...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

ICM UPM tool - running all impact durations at the same time

For any CSO assessment we do, we always have to compare standards for all impact durations (1hr, 6hr, 24hr). We’ve found setting up the tool the exact same way 3 separate times, only selecting a different impact duration, very slow and inefficient...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Add a feature for deselection of a group of elements in Geoplan

Many times we use polygon select feature to select elements in a particular extent, but there is no option of deselecting a small area within that selection - like in Arc Map
Ashwini 10 months ago in InfoWorks WS Pro / Operations 1 Gathering support

Management of Siltation module within ICM Live

As part of our ICM Live system we use the Siltation module. While this creates a dynamic siltation on each pipe, there isn't an easy way to manage it. Once a pipe is cleaned we need to stop the live model and potentially apply all the dynamic silt...
Jose Pereira over 4 years ago in InfoWorks ICM / Live Modeling / Water Quality 0 Gathering support