Skip to Main Content
Autodesk
Status Gathering support
Product InfoWorks ICM
Created by Jose Pereira
Created on Jun 22, 2021

Management of Siltation module within ICM Live

As part of our ICM Live system we use the Siltation module. While this creates a dynamic siltation on each pipe, there isn't an easy way to manage it. Once a pipe is cleaned we need to stop the live model and potentially apply all the dynamic silt levels to the conduits as if they were observed and restart the siltation module form scratch. We need a better way. Could we have a job created for PPM (as in InfoAsset) that would reset the dynamic value on specific pipes. This could be linked to InfoAsset?
  • Attach files