Limit the chamber sizing calculator to 200 chambers

The chamber size calculator will add any number of chambers necessary, however, the model will not validate if the number of chambers exceeds 200. It would be better to not allow the calculator to exceed the validation limit.
Daniel'le DeVoss almost 2 years ago in InfoDrainage / Hydraulics 0 For Review

Have a costs library available under the rehab actions page

With this functionality, users could have an estimated cost for all assets in their system as soon as they run the rehab tree. This eliminates additional data input and management making the cost reporting much more efficient specially for those u...
Martha Nunez almost 3 years ago in Info360 Asset / Rehab actions & cost 0 Under consideration

Adding a "Default" selection box when Outputting information

To ensure the information output is not too much or too little, it would be good to have a default set of information that can assist LLFAs in reviewing print outs. This came up during a webinar I attended about auditing models. Sometimes you can ...
Guest almost 2 years ago in InfoDrainage / Auditing / Reviewing 0 For Review

Increase the limit of Chambers allowed

Currently in the 2025.2 version I am running, the number of Chambers for subsurface storage/detention allowed is 200. The sizing calculator says I need more and wouldn't validate the model. Would be nice to have a higher limit.
Bryan Forrest almost 2 years ago in InfoDrainage / Hydraulics 0 For Review

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest almost 2 years ago in InfoDrainage / Productivity 0 For Review

InfoAsset Manager: Condition grade profile

In InfoAsset Manager there is the facility to calculate a structural condition grade profile for each pipe (i.e. the % of the pipe in each condition grade). Currently this is only available for surveys scored using the MSCC. We originally collabo...
Guest almost 4 years ago in Other Product Ideas / Asset Management 5 For Review

Correct calculation of volume within storage node when using porosity

Currently when a porosity value is applied to a storage node, the porosity is only applied for storage array entries which are below ground level. Storage array entries above ground level are assumed to have a porosity of 100%. Between the highest...
Lizzie almost 5 years ago in InfoWorks ICM / Hydraulics 1 Gathering support

Enable drawnet manhole changes

Enable the manholes assigned to impermeable areas on drawnet to be changed. It is currently not possible to change the manhole when editing a network meaning the areas have to be deleted then recreated. Being able to change the manhole would save...
Guest almost 4 years ago in InfoDrainage 1 Already exists

Enable locking of pipe numbers

One of the aims of BIM is that all the different models you create match. If you issue a pipe network 3D model for construction with certain pipe numbering and then a minor change happens this can affect every pipe number in the system. But once i...
Guest almost 4 years ago in InfoDrainage 0 Gathering support

Change the size / dimensions of multiple manholes at once

MicroDrainage Network It would be very useful if it was possible to change the dims of many manholes at once. It'a a very laborious and time consuming task to change each dimension one-by-one, especially if the network is very large!
Guest almost 4 years ago in InfoDrainage 1 Already exists