Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 868 of 1442

Add filters to inspection charts

The charts tool, when viewing PACP inspections, currently shows the distribution of scores only. For reporting purposes, it would be nice if some additional parameters could be added. For example, seeing the score distribution across pipe or inspe...
Kim Solberg almost 2 years ago in Info360 Asset / Map visualization 1 Under consideration

Reference risk and rehab results in risk model

Proposing increasing risk component types to include results from other risk models and rehab plans. Ideally, it would function similarly to the Pipe Inventory option within IAP that would allow you to select any table within the project database....
Kim Solberg almost 2 years ago in Info360 Asset / COF & LOF Categories / Components 1 Gathering support

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam almost 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub almost 2 years ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

Allow Theming Inflow areas by attributes

I would like to visually theme the Inflow areas by an attribute, say, Percent Impervious (PIMP)
Guest over 3 years ago in InfoWorks ICM / Theme / Visualization 0 Gathering support

Option to pan through 2 or multiple geoplans at the same time

Sometimes (in ICM and IAM) in comparing 2 (or more) networks visually the networks are most of the time tiled horizontally of vertically. But when panning through one network, it would be very convenient that the other network(s) is/are also movin...
Guest over 5 years ago in InfoWorks ICM / Productivity 0 Gathering support

Integrate w/Infor EAM

Specifically for City of Portland and City of Houston, would like to be able to integrate their data being collected in Infor including work order information.
Mike Maylone over 5 years ago in Info360 Asset / Other 1 Gathering support

Report InfoSWMM available capacity against theoretical flow for specified d/D

InfoSWMM provides Pipe/Conduit summary report with values for Max flow divided by "Full Flow". Here the "full flow" is based on Manning's equation for when the pipe is full. However as a sewer utility, we're not allowed to fill pipes. We must keep...
Guest over 5 years ago in InfoWorks ICM / Grids / Reporting 2 Gathering support

Consistency in Plots Titles for Simulation and Live Data Plot Reports

Consistency in Plots Titles for Simulation and Live Data Plot Reports In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011” C...
Guest over 5 years ago in InfoWorks WS Pro / Other 0 Gathering support

Restrict user ability to "Empty Recycle Bin"

Ideally it would be good to give a couple of named users the ability to empty the recycle bin - everyone else can send things TO the recycle bin, and can go into the bin to recover 'deleted' items, but they won't be able to empty it. This function...
Jason Kulsdom over 3 years ago in InfoWorks ICM / Productivity 0 Gathering support