Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Change pipe material based on inspections

Many utilities confirm or update pipe materials in their GIS data based on inspections; this is a feature that is possible within IAP. This was accomplished by comparing GIS materials to the imported inspection materials within the Validation tool...
Kim Solberg over 2 years ago in Info360 Asset / Data Editing 1 Gathering support

Ruby support for 'run_sql' method to return results

The method WSOpenNetwork.run_sql supports running a SQL query on the current network and results, e.g. to select and update objects in the network: Help | WSOpenNetwork | Autodesk. The current method cannot return the results of a SELECT query i.e...
Nathan Gerdts over 2 years ago in InfoWorks WS Pro / Automation 0 For Review

Skeletonize water distribution asset network to simplify asset risk and rehab modeling

Don't want to do risk/rehab on all mains. Would like to aggregate / combine assets based on a set criteria and perform risk and rehab on those combined asset classes. Filter management does not quite work ATM.
Tony Andrews over 1 year ago in Info360 Asset 0 Will not implement

GPU for 2D Erosion Deposition Model

The 2D erosion-deposition model can only be simulated on the CPU. For 2D rain-on-mesh models with GPU simulation times spanning hours, it becomes impractical to integrate the 2D erosion-deposition model, as CPU simulation times would extend into d...
Daniel Fensom almost 3 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Provide min_time_step on 2D results mesh

In an effort to speed simulations up - it would be helpful to know what mesh elements are slowing down a 2D simulation. A single Job Progress value is insufficient to chase down which of these 200K mesh elements is slowing down the model.
Guest almost 3 years ago in InfoWorks ICM / Results 1 Gathering support

Allow user to set number format in ICM grid windows

It would be great if a user could set number formats in InfoWorks ICM grid windows. For example, we are calibrating a large diameter pipeline by adjusting Manning's n values. We are using 5 digits after the decimal place, but ICM only shows 4 digi...
Andrew Fugal almost 6 years ago in InfoWorks ICM / Other 1 Gathering support

Generate Stats reports as a background task

Generate Stats reports as a background task so User Interface isn't locked - as for simutations and meshing
Robert Woodall over 4 years ago in InfoWorks ICM / Performance / Results 0 Gathering support

InfoAsset Online - Add Head Discharge Grid and Graph

This appears to be missing in IAO yet it is present in IAM. It is needed in IAO.
Jim O'Dowd almost 3 years ago in Other Product Ideas / Asset Management 0 For Review

Ability to snap to DWG or GIS background layers

When moving a manhole, I would like to snap to drawing geometry
Guest about 4 years ago in InfoWorks ICM / Productivity / Visualization 0 Gathering support

Right click for graphs

I am a Bentley WaterGEMS user recently transitioning to InfoWorks WS Pro. While WaterGEMS has got its fair share of problems, the interface is very user friendly. For example: after you run the simulation, the graphs can be viewed just by a single...
Guest almost 3 years ago in InfoWorks WS Pro / Productivity 1 Gathering support