Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Merge Phases

It would make life much easier if there was the ability to merge multiple phases together, instead of having to duplicate elements between phases. Duplication doesn't wholly work because connections can't be duplicated between phases.
Guest over 1 year ago in InfoDrainage / Data Exchange 0 For Review

Project Planning

Roll up rehab actions into projects, where users can optimize the actions based on factors like proximity of the assets, overall cost, work packages, etc.
Mike Maylone almost 4 years ago in Info360 Asset 0 Under consideration

Allow changing graphic order when creating historical charts

When building a historical chart, Info360 overlays the sensors in the same order as they are configured. When the visualization of a sensor is an area, and this sensor is not added first, then the area will overlay the trends for the other sensors...
Javier Coronado over 1 year ago in Info360 Insight / Workspaces 0 For Review

Export statistical template results automatically as part of the manifest.

Particularly CSO spill statistics - enabling models to be run maybe weekly with historical data, the statistics exported - spill nr, duration and particularly predicted volume. This data can then be analysed in tools outside of ICMLive. This data ...
Geoffrey Brown almost 4 years ago in InfoWorks ICM / Live Modeling / Results 0 Gathering support

Could we add a preference to disable the popup to accept the most recent run data?

The popup is confusing, and we don't see a point in not accepting the latest run results.
Deb Smith over 1 year ago in InfoWater Pro / Productivity 2 Gathering support

Workflow Manager

A tool where I can assign tasks to users to add information to analytics, workspaces, alerts, etc... that will link to each feature in the order it needs to be performed, and then send completed product for review and approval to another user.
Guest over 3 years ago in Info360 Insight / General 0 Gathering support

As an organization, we would like the ability to choose an alternative final risk calculation method.

So, InfoAsset Planner currently only provides the user one way of calculating a final risk score from chosen COFs and LOFs, and that is to sum the scores from all that are included in that risk model. It would great if the user could choose the ...
Guest almost 7 years ago in Other Product Ideas / Asset Management 5 Gathering support

InfoAsset Manager: Create blob fields for a Custom Object

Whilst it is possible in InfoAsset Manager to create Custom Objects, it is not possible to create a blob field on a Custom Object in such a manner similar to the CCTV or Flood Defence Survey's Details blob field. It would be useful if the Custom ...
Guest about 5 years ago in Other Product Ideas / Asset Management 0 Gathering support

Simplfy Downloading results

While running lots of models on the cloud - I need to process them in GIS (cause Clip meshing doesn allow me to compare these models), dowloading 21 simulations is a single-click action considering. Make the process easier.
Guest over 2 years ago in InfoWorks ICM / Info360 Cloud 2 Gathering support

3D View of flooded manholes

The extent of flooding in the 3D view should be proportional to the volume of flooding of that manhole. At the moment it shows the same extent of flooding whether it's 0.1m3 or 100m3. Would make visualisation the extent and location of flooding on...
Guest over 2 years ago in InfoDrainage / Visualization 1 Already exists