Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1374 of 1374

Enable the ability to review Debug Logs from external text editor

The internal Log results editor window is slow when loading over 100K lines. Needless to say - debugging a model where the debug log is 11 GB cant be done in the product, and the workflow to export to file is simply excruciatingly painful. As the ...
Guest about 2 years ago in InfoWorks ICM / Productivity 1 Gathering support

By default display ID in alphabetical order in Control Center Overview in InfoWater Pro

By default display ID in alphabetical order in Control Center Overview in InfoWater Pro
Mickey Liu 10 months ago in InfoWater Pro 0 For Review

Merge Phases

It would make life much easier if there was the ability to merge multiple phases together, instead of having to duplicate elements between phases. Duplication doesn't wholly work because connections can't be duplicated between phases.
Guest 10 months ago in InfoDrainage / Data Exchange 0 For Review

Update CAD data dynamically when updating externally (ie in C3D)

When you have cad data imported to an Infodrainage model you can’t update the data without it being closed i.e. in the example below I have the same drawing open in Civils 3D. So when a change is made and saved if you click reload cad data in Info...
Guest 10 months ago in InfoDrainage / Civil3D Integration 0 For Review

dendric numbering and table of results

its frustrating when interrogating and amending the pipe network, when the pipes and chambers are not in the same order, the way it was presented in MicroDrainage gave a clear path with the final outfall pipe being at the bottom, not randomly plac...
Steven Gilchrist over 2 years ago in InfoDrainage / Reporting 1 Under consideration

Option to change selection method to avoid the Multiple Selection dialogue

Often when I'm working on the GeoPlan, I want to select, identify, or label multiple nodes or links. Every time I click on one that intersects with a sub catchment though, I have to deal with the multiple selection dialogue and choose which featur...
Guest 10 months ago in InfoWorks ICM / Productivity 1 For Review

Promote recently used flags

It would help if your recently used flags were promoted to the top of the flags list. For example, I am updating flags for some manhole surveys (flagged "SM"). Alphabetically, SM is close to the bottom of the list which means I have to scroll to...
Benjamin Mauck over 4 years ago in InfoWorks ICM / Flags 2 Gathering support

GPU for 2D Erosion Deposition Model

The 2D erosion-deposition model can only be simulated on the CPU. For 2D rain-on-mesh models with GPU simulation times spanning hours, it becomes impractical to integrate the 2D erosion-deposition model, as CPU simulation times would extend into d...
Daniel Fensom about 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Pump Station Modelling

Infoworks ICM pump station modelling principle is very basic, adding a pump between two nodes is highly hypothetical. There is no way to add pump station head losses. I would like to suggest incorporating pump station modelling (for Rotodynamic pu...
Guest over 3 years ago in InfoWorks ICM / Hydraulics / Pumps 1 Gathering support

Simulation engine control update

Since the beginning of ICM and allowing to send simulation to other computers in the network, there was a need for knowing exactly who is currently sending simulations and to which computer. Please update the ICM with this improved functionality f...
Guest about 6 years ago in InfoWorks ICM / Productivity 5 Will not implement