Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 660 of 1374

Enforce velocity constraint on all pipes during Fireflow

InfoWater Pro offers the ability to constrain Fire flow at hydrants so that the max velocity in pipes doesn't exceed a specified threshold. Currently the only option is to enforce this on "Connected Pipes", assuming that the last pipe reaching the...
Nathan Gerdts over 1 year ago in InfoWater Pro / Engine 1 Gathering support

Linear Drainage 2D conduit branch

In complex drainage systems, open channels may culvert in the middle or branch in two directions; it is useful to be able to branch into multiple pipes when modelling open channels in LD2D.
Yota Machii 12 months ago in InfoWorks ICM / Network 1 Under consideration

Add "Cloud" Run Mode for InfoWater Pro Surge simulations

IWP Surge has the unique ability to run surge simulations without the need to skeletonize the model. However, the Standard mode is currently the only option for running Surge simulations (Background and Cloud are not available). On larger models a...
Michael Kane 12 months ago in InfoWater Pro / Cloud Simulations 0 For Review

SQL Selection to Selection Lists

The ability to use SQL is good - but there are commands that require selection lists.The workflow to go from SQL to Selection Lists by a click should be a button. Crop Selected Overlapping objects only allows seletion lists.
Guest about 2 years ago in InfoWorks ICM / Productivity 1 Gathering support

Expose Mesh Element Data in Ruby API

The mesh is arguably the most important aspect of the 2D model. General information like ground level, area, and roughness should be accessible through the API.
Luke Villanueva about 2 years ago in InfoWorks ICM / API / Exchange 3 Gathering support

Initial Tank Levels

It would be great to be able to change the initial tank levels without having to create a whole new tank data set or putting a duplicate tank in the current data set. That way, the initial tank level condition can be changed for any given scenario...
Guest about 6 years ago in InfoWater Pro / Operational Modeling 4 Will not implement

A Case for Supporting 2 InfoWorks and 2 SWMM Networks as the current and background networks

A Case for Supporting 2 InfoWorks and 2 SWMM Networks as the current and background networks. In other words, InfoWorks is the current background, and SWMM is the current and background. Right now, it is SWMM and InfoWorks as the current and backg...
Robert Dickinson about 1 year ago in InfoWorks ICM / Workgroup 2 Will not implement

closed pipe

One of the nice features of WSPro is the ability to simply close a pipe. This would come in very handy in ICM as well, as this would allow for some very cool what if analyses and makes it possible to keep a pipe in the network (for visualization) ...
Marcel Glasbergen over 2 years ago in InfoWorks ICM / InfoWorks 2 Gathering support

Inlet pump

We are mode and more incorporating surface water systems in our ICM models and part of those systems are inlet pumps that respond to the downstream levels instead of the upstream levels. Up until now, the only way to achieve this is by creating an...
Marcel Glasbergen over 2 years ago in InfoWorks ICM / Pumps / RTC 0 Gathering support

Make Dialog boxes extendable

There are dialog boxes that provide information that can not be "seen". Its hard to see what the second dependant element it.
Guest about 2 years ago in InfoWorks ICM / Productivity 3 Gathering support