Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 244 of 1442

Demand Area Analysis for partially metered areas

Demand Area Analysis was originally intended for networks where the unprofiled demand was unmetered. When domestic (unprofiled) metering became more prevalent Innovyze introduced “Current Average Specific Consumption (l/p/day)” in the calculation ...
Guest over 1 year ago in InfoWorks WS Pro / Productivity 2 For Review

Allow Customized Reports to Also Include Standard and Fireflow Results - Just Have One Result Table

Currently all model element information and results are separated between the DB Editor, Customizable Report, and Output Report/Graph. This is confusing and hard to export specific information together without having to combine it later in Excel o...
Joe Lawrence almost 5 years ago in InfoWater Pro 1 Gathering support

Include an "excluded search nodes" warning in fireflow output table

When the design pressure exceeds the static pressure at a particular node, that node will be excluded from a design fireflow model run. The output table should include a banner at the top listing the excluded nodes, as these can make a big differe...
Guest almost 5 years ago in InfoWater Pro / Engine 0 In progress

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest about 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam almost 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub almost 2 years ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

Consistency in Plots Titles for Simulation and Live Data Plot Reports

Consistency in Plots Titles for Simulation and Live Data Plot Reports In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011” C...
Guest over 5 years ago in InfoWorks WS Pro / Other 0 Gathering support

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ge...
Guest almost 6 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest almost 6 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Demand Diagram Timestep from Demand Area Calculation Page

When producing a Demand Diagram from the Demand Area Calculation Page, it would be useful to be able to choose the Demand Diagram Timestep (of course it can be les than the minimum Live Data timestep).
Paolo Boiardi about 2 years ago in InfoWorks WS Pro / Other 0 For Review