Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 244 of 1442

Scenarios in IWLive

Currently, it appears that scenarios set up in InfoWorks Pro cannot be viewed within IWLive. This is a significant drawback, as scenarios such as peak demand conditions are often used and need to be interrogated within IWLive. I think adding in th...
elizabeth Richardson about 2 months ago in InfoWorks WS Pro / Engine 0 Under consideration

Go to a node or link from a graph

It would be useful if you could simply Right-Click a graph and there be an option to "Go to node/link" to quickly go to it in the geoplan.
William Tracey 4 months ago in InfoWorks WS Pro / Other 0 Gathering support

Include pump HGL in simulation output

Standard output for InfoWater Pro includes hydraulic grade elevation for tanks and junctions. Since all pump design and performance information relates to hydraulic head (e.g., system curve, pump performance curve, etc.), in addition to (or in lie...
Michael Kane 2 months ago in InfoWater Pro / Productivity 0 Gathering support

Demand Area Analysis: Factoring Multiple Categories

Currently, Demand Area Analysis only allows demand adjustment to one Leakage and one Unmetered category at a time.It would be very useful to be able to factor additional demand categories such as:Average CustomersMetered DomesticCommercial (e.g. 1...
elizabeth Richardson 4 months ago in InfoWorks WS Pro / Other 3 Gathering support

Allow more elements to be included in Surge Group Graphs

Surge Group Graphs are limited to 40 elements (memory error if more), while Standard runs allow several hundred or more. Modern hardware should allow for a lot more than 40 elements in a graph.
Grant Clemens 2 months ago in InfoWater Pro / Productivity 0 On roadmap

Allow more data points and specific flow intervals in the System Curve run

The System Curve simulation is currently limited to 51 data points (PSA tool limited to 100), which is arbitrarily low for modern hardware capabilities. It would be nice to allow for more data points and/or to be able to set a specific flow interv...
Grant Clemens about 2 months ago in InfoWater Pro / Productivity 0 Under consideration

A way to toggle pumps on or off with a counter.

Under the rule-based control add a way to toggle pumps on/off when tanks cycle. For example, define the counter variable as N=0 initially, then when a tank completes one drain cycle N=1, 2nd drain cycle N=2, and your pump control would look to the...
Guest 2 months ago in InfoWater Pro / Other 2 Gathering support

easier import/update for demand diagram and demand scaling

I want to be able to import demand categories from csv. The format the ddg-file has to be in to be able to import it is very complex. Creating or updating Demand Diagrams can take up a lot of time
Caroline Heylen about 1 month ago in InfoWorks WS Pro / Productivity 1 For Review

result grid for customer points

Currently results for customer point minimum and maximum pressures can be retrieved using various steps.
Guest about 1 month ago in InfoWorks WS Pro / Automation 0 For Review

Run Network Review Fix on portion of model

I would like to run the Network Review Fix tools on a portion of a model. Currently most tools are run on the entire model and then a domain is created on potential items to fix. If i am adding newly installed water mains into an existing model it...
Chris Keil about 2 months ago in InfoWater Pro / Productivity 0 For Review