Skip to Main Content
Autodesk
Status Already exists
Categories Productivity
Created by Guest
Created on Jan 29, 2021

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc could be used for modelling specific scenarios for analyses. A tick box would enable (and disable) which control is used in the model run.
  • Attach files
  • Admin
    Nathan Gerdts
    Reply
    |
    Jul 19, 2023

    While we don't support the tick box option you suggestion (a great idea for live/operational modeling!), we do now support scenarios which can allow multiple varying control regimes in one model network.