Change upstream pipe connections

The ability to reassign the upstream component of a connection would be so useful. You can bulk import stormwater features and connections from AutoCAD but InfoDrainage does not seem to recognise when the connection is from the stormwater feature ...
Chloe Spencer about 1 year ago in InfoDrainage / Other 0 For Review

Better hydraulic representation of flow in permeable paving

Flow through permeable paving does not occur as one would expect. Is greatly affected by the shape and direction the paving is drawn in InfoDrainage. When drawing an irregular shape the hydraulic grade lines appear incorrect, with flow all at one ...
Guest about 1 year ago in InfoDrainage / Hydraulics 0 For Review

INTERLIS format importer of XML data for CCTV and Manhole Survey data

Support the importation of INTERLIS format XML data of CCTV and Manhole Survey data
Krzysztof Tchorzewski 7 months ago in Other Product Ideas / Asset Management 0 For Review

Option to compare Simulations of different time ranges superimposed on one graph [IWLive]

As an operator, I want to compare today's forecasted operations with different days in the past so I can see alternative ways how similar situations played out and make decisions with confidence. IWLive already offers functionality to compare two ...
Nathan Gerdts 7 months ago in InfoWorks WS Pro / Operations 0 For Review

Limit the chamber sizing calculator to 200 chambers

The chamber size calculator will add any number of chambers necessary, however, the model will not validate if the number of chambers exceeds 200. It would be better to not allow the calculator to exceed the validation limit.
Daniel'le DeVoss about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Adding a "Default" selection box when Outputting information

To ensure the information output is not too much or too little, it would be good to have a default set of information that can assist LLFAs in reviewing print outs. This came up during a webinar I attended about auditing models. Sometimes you can ...
Guest about 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Increase the limit of Chambers allowed

Currently in the 2025.2 version I am running, the number of Chambers for subsurface storage/detention allowed is 200. The sizing calculator says I need more and wouldn't validate the model. Would be nice to have a higher limit.
Bryan Forrest about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Better Asset Management

Asset management is crucial in a treatment plant for several reasons: Optimal Performance: Regular monitoring and maintenance of assets ensure that they are functioning at their best. This leads to efficient water treatment processes and high-qual...
Guest almost 2 years ago in Info360 Insight / Asset 0 For Review

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest about 1 year ago in InfoDrainage / Productivity 0 For Review

PACP Split Survey observations enhancements

The issue is when the application is asked to split a survey and the survey is a PACP inspection, NASSCO expects a few things to be on the inspection. First, the first code on the inspection should be AMH with remarks (this could be the node that ...
Krzysztof Tchorzewski over 1 year ago in Other Product Ideas / Asset Management 0 For Review