Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Depths, Velocity and Hazard raster creation

it would be great if ICM could include a tool to create multiple rasters. I understand that generating the initial 2D shapefile and processing the results to find the maximum values is the hard task. But once this shapefile is ready, converting it...
Gamaleldin Essam over 1 year ago in InfoWorks ICM / Sharing 1 Under consideration

Results tables to be ordered from most upstream junction/connection to outfall

As per the title, currently the results tables are presented in numerical order - which doesn't always make sense when interpreting the results. I.e should be presented in the same order they were in Microdrainage.
Guest about 2 years ago in InfoDrainage / Reporting 0 For Review

Feature request for bulk delete of scenarios

I would like to request a feature that allows users to delete multiple scenarios at once within a single model network. After creating a base model in the model network, users often generate multiple scenarios to explore different countermeasures ...
Nami Ikarashi about 1 year ago in InfoWorks ICM / Scenario 8 Under consideration

Ability to use variables in range RTC rules

For RTC range rules, we want to be able to use variables instead of constant values for the minimum and maximum values.
Guest over 3 years ago in InfoWorks ICM / RTC 0 Gathering support

Allow more data points and specific flow intervals in the System Curve run

The System Curve simulation is currently limited to 51 data points (PSA tool limited to 100), which is arbitrarily low for modern hardware capabilities. It would be nice to allow for more data points and/or to be able to set a specific flow interv...
Grant Clemens 8 months ago in InfoWater Pro / Productivity 0 Under consideration

Automated Data Exchange with InfoAsset Manager

If we think of asset management as divided into day-to-day work and organization (InfoAsset Manager) and long term, CIP planning work (Info360 Asset), this idea would bring asset management full circle. It'd also provide a huge workflow benefit fo...
Tim Medearis almost 3 years ago in Info360 Asset / Integrations 4 On roadmap

Copy Stored Graphs with InfoWater Sync

Please add support for copying Stored Graphs between local and server copies of models with the InfoWater Sync tool. This is a very important tool for evaluating models and it would be very helpful to retain them when syncing between a server and ...
Guest about 1 year ago in InfoWater Pro / Data Exchange 1 Under consideration

Improve print layout functionality

The print layout functionality is incredibly basic and hasn't been improved for several years. At present, we tend to export results out of Infoworks and use 3rd party GIS to produce figures as the Infoworks layout tool isn't sufficient to create ...
Unknown Unknown over 2 years ago in InfoWorks ICM / Printing 1 Gathering support

A way to toggle pumps on or off with a counter.

Under the rule-based control add a way to toggle pumps on/off when tanks cycle. For example, define the counter variable as N=0 initially, then when a tank completes one drain cycle N=1, 2nd drain cycle N=2, and your pump control would look to the...
Guest 8 months ago in InfoWater Pro / Other 2 Gathering support

Profiles showing phase information

Several students have asked for the ability to see various data on Profiles from multiple phases. To visually compare data. They can see the some info with graphs, but would like similar capability with Profiles.
Guest 2 months ago in InfoDrainage / Reporting 0 For Review