Limit the chamber sizing calculator to 200 chambers

The chamber size calculator will add any number of chambers necessary, however, the model will not validate if the number of chambers exceeds 200. It would be better to not allow the calculator to exceed the validation limit.
Daniel'le DeVoss 8 months ago in InfoDrainage / Hydraulics 0 For Review

Adding a "Default" selection box when Outputting information

To ensure the information output is not too much or too little, it would be good to have a default set of information that can assist LLFAs in reviewing print outs. This came up during a webinar I attended about auditing models. Sometimes you can ...
Guest 9 months ago in InfoDrainage / Auditing / Reviewing 0 For Review

Allow underdrains to be displayed in the connection tables and add pipe number to them

It is very difficult to create a quick and logical pipe schedule when pipes such as underdrains are hidden in the SuDS nodes and their upstream invert level needs to be calculated manually. Please add the underdrains to the connection tables with ...
Iwona Savas 4 months ago in InfoDrainage 0 For Review

Increase the limit of Chambers allowed

Currently in the 2025.2 version I am running, the number of Chambers for subsurface storage/detention allowed is 200. The sizing calculator says I need more and wouldn't validate the model. Would be nice to have a higher limit.
Bryan Forrest 9 months ago in InfoDrainage / Hydraulics 0 For Review

Adding interception and evaporation losses to Permeable Pavements, Bioretention systems etc.

There is currently no option to consider depression storage, interception and evaporation losses while modelling SuDS components such as Permeable Pavements, Bioretention systems etc in InfoDrainage. The option was available in MicroDrainage and i...
Dilraj KT almost 2 years ago in InfoDrainage / Hydrology 1 Gathering support

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest 9 months ago in InfoDrainage / Productivity 0 For Review

Sort Manhole Schedules in Numerical Order

Hello, It should be possible to sort Manhole Schedules in Numerical Order - currently the randomness has lead to many questions & queries from site which has a risk for setting out/construction errors. It should also be possible to add MH type...
Guest 9 months ago in InfoDrainage / Reporting 0 For Review

Add Snowmelt to InfoDrainage

The addition of SWMM5 snowmelt will make it easier to model LID's in North America which has a lot of snowfall in Canada and the northern USA. Snowmelt can be a significant source of water annually to a LID or SuDS.
ROBERT DICKENSON almost 2 years ago in InfoDrainage / Hydrology 1 Under consideration

Simulation Health Improvements

In certain instances, the suggestions provided in "Simulation Health: The results indicate flow continuity issues, even when the shortest time step is already selected in InfoDrainage" may not resolve the problem. This could be addressed by incorp...
Guest about 1 year ago in InfoDrainage / Hydraulics 1 In progress

Variable baseflow

(Could also be considered hydraulics) On large scale projects where we may have limited information and funding, we assume baseflow values through an upstream point inflow. It would be beneficial to have a variable baseflow input per design storm....