Skip to Main Content
Autodesk
ADD A NEW IDEA

Info360 Asset

Showing 159 of 1228

Work Order Close & Follow Up

No description provided
Mike Maylone about 2 years ago in Info360 Asset / Work Management 0 Gathering support

When Survey Length is Different than pipe length, do not give a warning unless it is larger than 5ft difference.

Many inspections end up with warnings when this very common issue comes up. Most of the time survey length and pipe length will be different because the GIS is not 100% perfect.
Guest about 2 years ago in Info360 Asset / Inspection & Media Management Workflows 1 Gathering support

Import logs for CCTV when an inspection does not match to a pipe.

This is useful for many reasons related to data management but the following used case came up when talking to Martin and Martin: If a field technician uploads inspections but accidentally inputs a typo under the manhole or pipe asset ID then the ...
Guest about 2 years ago in Info360 Asset / Import / Upload 0 Under consideration

Generate Risk/Rehab results for segments not assets - Stormwater

In stormwater systems assets change structural characteristics along the length of the asset. This means, materials change and this needs to be represented in the risk analysis. In addition, work tasks are generated for segments instead of the ful...
Martha Nunez over 1 year ago in Info360 Asset / Risk 0 Gathering support

Info360 Asset - Condition Grade Profile

The condition grade profile is an extension to the scoring for CCTV surveys. In addition to the normal scoring (peak scores, etc.) a survey can be broken down into grades. The percentage of grades present from 1 to 5 can be calculated for each pip...
Tony Andrews about 2 years ago in Info360 Asset 0 For Review

Selection Sets

A network might need to be divided into areas based on spatial location, attributes, risk, data, etc. Users might want to evaluate an specific area differently than the other parts of their network. Consultants with multiple networks in one hub mi...
Tim Medearis over 1 year ago in Info360 Asset / Data Management 1 In progress

Add differentiator between Plant/Asset/Insight on top left corner

I think it would be helpful to add the word Plant, Asset or Insight next to the Info360 Logo on the upper left corner. Please see image below for reference.
Salvador Bentolila about 2 years ago in Info360 Asset / General 1 Gathering support

[Copy] Option to adjust the opacity/transparency of background networks

it would be useful to apply a % opacity/transparency to background networks, without the need to adjust the individual visibility in the Layer and Theme tab. It would also be useful to have the option in the GIS layer control, for individual loade...
Brad Thompson over 1 year ago in Info360 Asset / Map visualization 0 Gathering support

Integration - Inspections (Granite, IT Pipes, Wincan)

Stream inspection videos from Granite, IT Pipes, Wincan. Import inspection records and code defects.
Mike Maylone over 2 years ago in Info360 Asset / Other 0 On roadmap

Allow users to search by the 'segment ID' field.

For some cities, the segment ID is the primary ID that they use to track and manage work. In Info360 Asset the segment ID gets 'hidden' under the asset details and cities can not find it unless they know the parent asset ID for that pipe which is ...
Martha Nunez over 1 year ago in Info360 Asset 0 Gathering support