Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks ICM

Showing 534 of 1329

Adding Level 3/4 water quality processing to the ICM upm tool.

For future catchment studies, we are looking at completing higher levels of water quality impact assessment, Level 3/Level 4. For this we would like the UPM tool to be able to integrate ICM river models to represent river flows and river quality a...
Guest almost 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Add simple percentage difference in calibration graphs

Add a simple percent error field between Overserved vs Model results (for min/max depth, flow, volume and velocity) in calibration graphs. Calibration targets are often presented as +- x%. Including a percent error field will make it much easier w...
Guest almost 2 years ago in InfoWorks ICM / Calibration 0 Gathering support

Zoom graphs on either axis

Many software suites allow the option to zoom in on both y and x axes on their graphs. However, ICM only allows zooming on the x-axis which often takes away the ability to see trends for lower or higher conditions. I am aware that it is possible t...
Guest almost 4 years ago in InfoWorks ICM / Calibration / Productivity / Results 4 Gathering support

Export run results to csv: timestep options

When exporting run results to csv, it would be useful to select a timeframe you wish to export (excluding for instance the initial conditions that haven't settled into a level that makes sense). Also exporting at a different timestep than the one ...
Guest over 2 years ago in InfoWorks ICM / Export Data / Results 0 Gathering support

Option to change selection method to avoid the Multiple Selection dialogue

Often when I'm working on the GeoPlan, I want to select, identify, or label multiple nodes or links. Every time I click on one that intersects with a sub catchment though, I have to deal with the multiple selection dialogue and choose which featur...
Guest 4 months ago in InfoWorks ICM / Productivity 1 For Review

InfoWorks ICM needs to number 2D mesh elements using a Hexagon framework or similiar method if this is stormwater design tool of the future

A remesh in a scenario will move mesh element IDs all over the place rendering a new channel useless for design purposes. The maximum wsel equations makes the mesh look like a kalediscope. Uber uses Hexagons to subdivide the world, and I am sugges...
Guest 10 months ago in InfoWorks ICM / 2D Flooding 3 Gathering support

Set up runs more efficiently

Is there a matrix type tool in ICM that allows you to easily set up complicated run set ups? i.e. for this 1 Model Network, these runs with use these rainfall files, inflow files, WWG, etc are needed. Model Name Base Model Rainfall Inflow WWG...
Guest about 5 years ago in InfoWorks ICM / Productivity / Simulations 0 Gathering support

Bank line export for inline banks

If you export ICM results, the inline banks are now exported as the lines between the 2D outfall and the node that determines the 1D level. This is a meaningless object, whereas exporting the bank line geometry that is attached to it makes it much...
Marcel Glasbergen 8 months ago in InfoWorks ICM / Reporting 1 Gathering support

Modify Peaking Constant/Shape Factor in SCS Routing Model

There isn't a good way to modify the peaking constant also referred to at the shape factor for developing an SCS hydrograph in ICM networks. The most common is 484 which is the constant used in an ICM network, but there are occasional needs to mod...
Ryan Brown about 1 year ago in InfoWorks ICM / Hydrology 5 Under consideration

Capability to restore multiple pruned links

It is cumbersome to restore pruned links one at a time if many assets need to be restored. The ability to restore a selection of pruned links and/or all pruned links would be helpful.
Guest about 1 year ago in InfoWorks ICM / Network 2 Gathering support