Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 201 of 1370

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body almost 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Graph RTC variables

RTC variables can be useful when modelling complex systems, but while I can check individual timestep values of variables using the log, it would be helpful to be able to visualize these on a graph (and compare it with other simulation results).
Iain Scott 7 months ago in InfoWorks ICM / Results 3 Gathering support

simulation .elog file available via UI

Prior to ICM 2025, right clicking on the completed simulation > Open As would give access to the "simulation log", which contained useful details about the initialisation and failure reasons of the simulation. It would also contain diagnostics ...
Iain Scott 4 months ago in InfoWorks ICM / Results 1 Under consideration

Extra Results Outputs for some features in ICM

Hi there - Doing some work for a client I found the following limitations in results exports from Infoworks ICM: 2D Base Linear Structure: ls_underflow and ls_overflow results variables cannot have a summary of peak value exported by CSV or SHP. T...
Guest 8 months ago in InfoWorks ICM / Results 0 For Review

Design ARV & Washout size - Simulate losses & airflow during system drain down

As a planning and design team, we need to size air valves and wash outs for our system so that large pipes can be drained for maintenance in a timely manner. InfoWorks WS Pro models the draindown of water after isolation, but it doesn't take into ...
Nathan Gerdts about 2 months ago in InfoWorks WS Pro / Operations 0 For Review

Expand Primary Key Fields to Support UUIDs

It would be helpful to use UUIDs as primary/secondary key fields for row objects for data exchange with other GIS databases. It could also be a better way of generating new IDs than the default approach of sequential numbers, which cause problems ...
Dave Watts 6 months ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Pause simulations during server restarts

Please could we have an ability to auto-pause simulations whilst an InfoWorks ICM server is restarted? As part of the wider drive to reduce CSO spills there is an increasing need to run long time series through sewer models. This can require model...
Tom Walker almost 3 years ago in InfoWorks ICM / Simulations 2 Gathering support

Templates for GMR Config Objects

We have a large team of modelers that manage many different GMR runs. It's important to keep the Output and Analysis options matching between these runs.We want to manage a central template to define and control consistent options between many GMR...
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Productivity 0 Gathering support

IWLive - alernative warning themes for polygons

Currently IWLive polygons can theme based on the most severe warning. We want an option to theme instead based on which polygon contains the most warnings, and potentially other options like the earliest warning.
Nathan Gerdts about 2 years ago in InfoWorks WS Pro 0 Under consideration

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest almost 3 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support