Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 203 of 1370

Enable 3D video in defects tab of surveys

3D video can provide additional insight for sewer inspections (manhole & CCTV). As of now, the viewer in the defects tab doesn't have the standard panning functionality necessary for viewing 3D video.
Guest 8 months ago in Other Product Ideas / Asset Management 1 For Review

Display critical results for indvidual elements

With the variability of design rainfall patterns, critical hydraulic results (mean/median/min/max) often occur at different rainfall durations for different elements (eg specific pipe/MH/channel/etc) within a network for the same rainfall event pr...
matthew.piggott about 1 year ago in InfoWorks ICM / Results 2 Already exists

Improve database and results files read performance

When opening an ICM network for the first time (i.e. no network files in the local files "Working" folder), the WDS reads through the database file in 4 kB chunks to retrieve the requested version of the network. This read process appears to be li...
Peter Dunlop almost 4 years ago in InfoWorks ICM / Performance / Results 3 Gathering support

XPSWMM - Save created .Xptin surface in same directory as the LandXML file.

When creating a surface using the "Import LandXML" option, the created .xptin file saves to the temp folder on my C:Drive. Please add option to save the .xptin file to the same folder/directory as the LandXML file used to create the surface. XPSWM...
Guest about 2 months ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 For Review

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body almost 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Graph RTC variables

RTC variables can be useful when modelling complex systems, but while I can check individual timestep values of variables using the log, it would be helpful to be able to visualize these on a graph (and compare it with other simulation results).
Iain Scott 7 months ago in InfoWorks ICM / Results 3 Gathering support

simulation .elog file available via UI

Prior to ICM 2025, right clicking on the completed simulation > Open As would give access to the "simulation log", which contained useful details about the initialisation and failure reasons of the simulation. It would also contain diagnostics ...
Iain Scott 4 months ago in InfoWorks ICM / Results 1 Under consideration

Extra Results Outputs for some features in ICM

Hi there - Doing some work for a client I found the following limitations in results exports from Infoworks ICM: 2D Base Linear Structure: ls_underflow and ls_overflow results variables cannot have a summary of peak value exported by CSV or SHP. T...
Guest 8 months ago in InfoWorks ICM / Results 0 For Review

Pause simulations during server restarts

Please could we have an ability to auto-pause simulations whilst an InfoWorks ICM server is restarted? As part of the wider drive to reduce CSO spills there is an increasing need to run long time series through sewer models. This can require model...
Tom Walker almost 3 years ago in InfoWorks ICM / Simulations 2 Gathering support