Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1383 of 1383

Only update interpreted points on Bank Line when updating from Ground Model

When updating bank lines from ground model it would be useful to have an option was available to only update the interpreted points, therefore retaining vertices heights from cross sections and surveyed points. Or an option to easily delete the in...
Guest over 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support

4K Screen

Not everything works well with 4K monitors (grips). Let's get real 4K workflow - not just a DPI scaling solution.
Guest about 2 years ago in InfoWorks ICM / Productivity 0 Gathering support

WBNM Hydrology Method in ICM

Australian flood modelling user have requested access to the WBNM hydrology method inside InfoWorks ICM. WBNM is one of the endorsed methods in Australian Rainfall & Runoff and large numbers of historical studies use this method.
Guest over 5 years ago in InfoWorks ICM / Rainfall 0 Gathering support

Option to compare Simulations of different time ranges superimposed on one graph [IWLive]

As an operator, I want to compare today's forecasted operations with different days in the past so I can see alternative ways how similar situations played out and make decisions with confidence. IWLive already offers functionality to compare two ...
Nathan Gerdts 9 months ago in InfoWorks WS Pro / Operations 0 For Review

Better Video Encoders

The AVI recorder uses a Windows 11 unknown CODEC - update the video encoder to something modern!
Guest over 1 year ago in InfoWorks ICM / Performance 1 Under consideration

Include a Rainfall Generator Using Environment Canada Data

Similar to the ARR and NOAA 14 storm generators, build one that could utilize Environment Canada data with common distribution types.
Guest over 4 years ago in InfoWorks ICM / Rainfall 1 Gathering support

Allow all objects (nodes, subcatchments etc) to be included within the ‘gauge’ objects used in the run window

In a simulation run window the user has the choice to use a selection list of 'gauged' objects. This is useful so as to provide the results of some objects more frequently, or to only save the results from some objects and not others, in order to ...
Lizzie over 4 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

Include the volume of the downstram manhole ONLY if selected

Change behaviour of Storage Operations: Calculate total storage... function. The current behaviour is unintuitive and incorrect.
Guest over 1 year ago in InfoWorks ICM / Network 3 Under consideration

Add Vertex Workflow

The Edit Geometry Workflow for adding, and editting vertex is fragile. Inserting a vertex breaks the linear aspect of the 2D boundary as InfoWorks does not provide any feedback. Autodesk workflows in Civil 3D, InfraWorks, and Revit provide user fe...
Guest about 2 years ago in InfoWorks ICM / Mesh 0 Gathering support

2D Result Long Profile results comparison

When doing flood study, XPSWMM had a cross-section tool that would show WSEL. While I can use US/DS profiles to compare two scenarions - I want to cut a long section along a 2D channel (and no I am not converting it to River Sections as it defeats...
Guest over 1 year ago in InfoWorks ICM / 2D Flooding 1 Gathering support