Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1383 of 1383

Model Build Automation Interface

Updating models from GIS and other sources requires a careful sequence of many steps that InfoWorks supports through various tools. However, scripting is the only way to assemble that in a repeatable seqeunce of tasks. As a modeler, I want a tool ...
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Automation 0 In progress

InfoAsset Mobile - Report window View On Map highlight report location

From the Report Edit/View window, when a user clicks on View On Map from the ribbon, on the Map it would be useful if the map icon of the report flashed or was highlighted in some way to make it explicitly clear the location of the report from whi...
Krzysztof Tchorzewski over 1 year ago in Other Product Ideas / Asset Management 0 For Review

InfoAsset Mobile - Image / Sketch allow paste

When editing a Report, it would be useful to be able to paste an image (from clipboard, for instance a screenshot of another application) into an image/attachments control and/or paste into the 'Image / Sketch Editor' tool
Krzysztof Tchorzewski over 1 year ago in Other Product Ideas / Asset Management 0 For Review

Merge pond and storage nodes and increase their functionality

Pond nodes: - allow variable infiltration at different levels (up to 3 different rates) - allow variable perimeter with level i.e. plan area through which side infiltration can occurs can vary - no porosity function Storage nodes: - 1 porosity va...
Lizzie over 4 years ago in InfoWorks ICM / Hydraulics / SUDS 1 Gathering support

Update Scenario Explorer terminology to match Run Manager

Modelers can use the "General" tab in the IWP Scenario Explorer to assign specific Report, Simulation and Time options to a scenario. To avoid confusion, the label shown in the Scenario Explorer should be changed to match the Run Manager.
Michael Kane over 1 year ago in InfoWater Pro / Other 0 Gathering support

Baseline Replacement Cost Tool

IAP has a very simple baseline replacement cost tool. It has been requested to be in Info360 Asset. Could be rolled into the deterioration modeling tool. https://help.innovyze.com/space/infoassetplanner/15794424/Baseline+Replacement+Cost
Tim Medearis about 2 years ago in Info360 Asset / Rehabilitation Planning 1 Under consideration

Sorting a conduit grid table based on upstream-downstream order (or vice-versa)

Help to sort a grid table (such as conduit) in order of upstream to downstream or vice-versa will be very helpful to modellers.
Guest over 2 years ago in InfoWorks ICM / Grids 0 Gathering support

Channel library similar to pipe library

It is essential to add / create library for rectangular channels with different width such as 300mm, 450mm width. Currently infodrainage choose a default 600mm wide rectangular channel. It is essential to have options to set minimum width other th...
Guest about 2 years ago in InfoDrainage / Hydraulics 1 Gathering support

Pruning does not sub reassign drainage links correctly

When pruning, subcatchment drainage manholes are reassigned to the first modeled downstream manhole. However, when pruning subcatchments that drain to single or multiple links, ICM gives incorrect results in some cases and doesn't work at all in o...
Andrew Fugal over 4 years ago in InfoWorks ICM / Productivity 0 Gathering support

Right click menu on objects to graph, trace, edit, etc. Similar to ICM

I want to interact with my model primarily from the map rather than relying on toolbars. Namely, I want to select an object and then access an action menu to graph, edit, trace, label, etc on that object. Note: ICM already supports this feature, s...
Nathan Gerdts 9 months ago in InfoWorks WS Pro / Productivity 0 For Review