Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1402 of 1402

Right-click and respecify connection origin

Currently, we can right-click and respecify connection (and bypass connection) destinations. We need the ability to respecify origins as well, to avoid having to redraw connections.
Daniel'le DeVoss 12 months ago in InfoDrainage / Hydrology 0 For Review

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh over 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

New docked quick graph view of selected object

When reviewing the model, I want an active graph panel I can dock anywhere that always shows me the selected object. Each time I select a new object, update the graph with the default output type. If possible, include option to select multiple obj...
Nathan Gerdts 9 months ago in InfoWater Pro / Productivity 0 Gathering support

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body about 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Allow Constant Water Level in Tanks

We frequently need to run multiple time steps on steady-state simulations. Currently, to maintain a constant water surface elevation, we use a Reservoir element instead of a Tank. As a result, our models now include both a Tank (for non-steady-sta...
Joshua Alexander 7 months ago in InfoWater Pro / Productivity 0 Gathering support

Commit history for scenarios

Commit history for scenarios Show an extra column in the commit history window to indicate how many scenarios exist in this version of the network. Ideally, there would be a button or column through which you can see the names of the scenarios for...
Annemie Vermeulen over 3 years ago in InfoWorks ICM / Scenario 1 Gathering support

Allow underdrains to have a different slope to the SuDS feature

Allow a storage structure such as dry swale, bioretention area or infiltration trench to have a different slope to the underdrain. Currently the underdrain has to follow the slope of the feature, which is not a real life representation of how they...
Oliver Dodd over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Stub out CCTV Lateral Defects

In InfoAsset Planner, the CCTV data for laterals was stubbed out and drawn into the GIS as a polyline. In Info360 Asset, these 'defects' are still visualized only as a point on the pipe, as an 'X'. Seeing the laterals is extremely valuable and 'pa...
Tim Medearis about 2 years ago in Info360 Asset / Map visualization 3 Under consideration

Easily transform node from one type to another

Self explanatory. Use a user selection or domain.
Colin Ricks about 1 year ago in InfoWater Pro / Productivity 1 Under consideration

Change the way scenarios work

When scenarios were first introduced the way they were implemented didn't seem intuitive. With increasing interest in such as adaptive pathways the number of scenarios can rapidly increase because each scenario is its own network. This proposal is...
andy.bolden over 2 years ago in InfoWorks ICM / Scenario 0 Gathering support