Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1375 of 1375

As a user, I need to burn the 1D river into ground model, so the flooding extent inside the 1D river channel is shown accurately

HEC-RAS has a tool in RAS Mapper doing just that. https://www.kleinschmidtgroup.com/ras-post/including-channel-bathymetry-into-your-terrain/
Guest over 5 years ago in InfoWorks ICM / Terrain 2 Gathering support

Using SWMM5 treatment equations at a node or link in ICM Networks

Users would like to use SWMM5 Buildup Washoff in ICM Networks AND the SWMM5 treatment equations at a node or link in the ICM St Venant solution. ICM SWMM networks have both options but for the purposes of using the powerful routing solution in I...
ROBERT DICKENSON over 4 years ago in InfoWorks ICM / Treatment / Water Quality 2 Gathering support

Units for catchment area: add km²

The choice of display units of the catchment area (under Tools--> Options--> Units) is now limited to ha or acre, which is not convenient for our river subcatchments. It would be useful to add the possibility of km².
Michael Huybrighs about 2 years ago in InfoWorks ICM / Other 0 Gathering support

As a user I want to change the amount of decimals when applying Autolabels in Infoworks ICM

I want to change the amount of decimals when I apply Autolabels in Properties and Themes. Right now the default is three decimal places which I cannot edit.
Guest about 4 years ago in InfoWorks ICM / Labels 1 Gathering support

Add a Brownfield Runoff tool under Preliminary Sizing > Calculators in the ribbon

To assist with initial site assessment, a brownfield runoff tool with printable reporting for the chosen rainfall events would be useful in the Preliminary sizing ribbon to allow analysis of brownfield and greenfield runoff rates from the same loc...
Guest almost 2 years ago in InfoDrainage / Hydrology 2 Already exists

Daytime and Night-time Agent Options

In my team, ICM simulations are spread out to run across all of our modelling PCs, via the coordinator. However, we are struggling to reach a compromise in setting the "Max threads total" value for some users - the balance between letting sims com...
Jason Kulsdom over 2 years ago in InfoWorks ICM / Performance 1 Will not implement

Bank marker distinctions

It would be good if cross sections for rivers could be marked with left and right bank markers within the cross sections themselves.
Guest almost 6 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Group InfoWater Pro pumps into a pump station object that aggregates results

As a modeler I want to summarize the behavior of a pump station of multiple pumps using a polygon. This helps me summarize energy usage and total flow without needing to select arbirary upstream or downstream objects. This also helps simplify syst...
Guest about 4 years ago in InfoWater Pro / Operational Modeling 1 Gathering support

Enable to choose time zone for exported radar SHP files

In general, radar files are based on UTC, and they are loaded into appropriate local time by choosing the original time zone in the radar configuration dialog. It allows ICM to load radar files with local time correctly. However, once they are exp...
Miyuki Okuda almost 2 years ago in InfoWorks ICM / Export Data 0 Gathering support

Hybrid gravel and crate soakaway option

We would like a Stormwater control (soakaway) feature that allows for a narrow gravel trench below a crate layer within the same soakaway, we have tried modelling as two separate features but the interaction between the two systems isn't accurate ...
Mark Jennings 6 months ago in InfoDrainage / Hydraulics 0 For Review