Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1387 of 1387

Add ability to create custom channel as underdrain (not just pipe)

Currently, you can only chose a pipe or multiple pipes as the underdrain within various features (infiltration trench, dry swale etc.). It would be great if a custom channel (section) could be used so an infiltration trench could be used to model ...
Oliver Dodd over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Conveyance on cross section lines

Provide cross section conveyance for each cross section
Guest over 6 years ago in InfoWorks ICM / Hydraulics / River Modeling 1 Gathering support

Pump Station Modelling

Infoworks ICM pump station modelling principle is very basic, adding a pump between two nodes is highly hypothetical. There is no way to add pump station head losses. I would like to suggest incorporating pump station modelling (for Rotodynamic pu...
Guest almost 4 years ago in InfoWorks ICM / Hydraulics / Pumps 1 Gathering support

Copy all settings from parent when creating new Scenario

When creating a new child Scenario, all the data sets are copied from the parent. However the Facility settings and General settings are ignored and the system defaults are used. Please copy all settings when creating new Scenarios to avoid errors.
Nathan Gerdts over 1 year ago in InfoWater Pro / Productivity 0 Gathering support

Add summary statistic results for MSX outputs

I want to view Min, Max, and Avg statistics for my MSX results directly on the map so that I can summarize results spatially. Currently MSX results provide time-varying results for mapping of each species, but not the summary statistics across the...
Nathan Gerdts over 1 year ago in InfoWater Pro / Water Quality 0 Gathering support

Add 2D result labels for ICM mesh elements

I would like to display the 2D results (depth, elevation, velocity) at each individual GRID cell using labels. This is currently available in XPSWMM, so I would like the same functionality in InfoWorks ICM as I would rather not have to export the...
Guest over 4 years ago in InfoWorks ICM / Labels / Results 1 Gathering support

Allow Simulation Time and Reporting Time to set independently

Similar to the functionality available InfoWSWMM where you are able to define a start date and time for the simulation and a start date and time for results. This allows initial phases of the model simulation to be ignored by the results without n...
Guest over 1 year ago in InfoWorks ICM / Simulations 2 Gathering support

Enable the ability to review Debug Logs from external text editor

The internal Log results editor window is slow when loading over 100K lines. Needless to say - debugging a model where the debug log is 11 GB cant be done in the product, and the workflow to export to file is simply excruciatingly painful. As the ...
Guest about 2 years ago in InfoWorks ICM / Productivity 1 Gathering support

dendric numbering and table of results

its frustrating when interrogating and amending the pipe network, when the pipes and chambers are not in the same order, the way it was presented in MicroDrainage gave a clear path with the final outfall pipe being at the bottom, not randomly plac...
Steven Gilchrist over 2 years ago in InfoDrainage / Reporting 1 Under consideration

Expanded use of the 'lining material' field

Pipes that are lined have to be updated in the GIS. Info360 Asset provides 'lining material' and 'lining type' fields. I think it would be beneficial to utilize this field in the risk analysis when assessing the 'pipe material' component to look a...
Martha Nunez over 1 year ago in Info360 Asset / Asset Deterioration Modeling 0 Gathering support