Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1387 of 1387

Use outflow from one phase as inflow into another phase.

When working on large, multi-phase projects in InfoDrainage, it is common practice to model each development phase in different InfoDrainage phases. However, challenges arise when runoff from one phase discharges into another. Currently, users mus...
Guest 11 months ago in InfoDrainage / Data Exchange 0 For Review

Histograms

The first step toward industrial optimization is establishing a baseline performance. In plants, histograms visualize historical performance statically. The shape of KPI histograms allows quickly establishing operation performance, i.e. high varia...
Javier Coronado 12 months ago in Info360 Insight / Data 0 For Review

Flooding extents boundary

Would like the ability to export the maximum 2D flooded boundary so I can show this in Civil 3D.
Guest 12 months ago in InfoDrainage / 2D Flooding 2 Already exists

Run same return period with multiple climate change allowances

When running the simulation wizard I would like to be able to run the same return period with multiple climate change allowances to enable a single analysis covering all scenarios. This will avoid needing to adjust inputs & rerunning the netwo...
Guest over 3 years ago in InfoDrainage 1 Already exists

Automated Calibration Tool

Tool similar to competing software where you can apply a level (%) of uncertainty and automatically sun simulations with varied parameters withing that level of uncertainty and see all results at once.
Guest over 5 years ago in InfoWorks ICM / Calibration 2 Gathering support

Steady state simulations for different times or for average demand

Steady state simulations are useful for 1) evaluating an initial or simplified version of a model (for example with average demands) or 2) evaluating a specific condition (like maximum demand, etc.) without much complexity. If your model is alread...
Felipe Hernandez 6 months ago in InfoWater Pro / Engine 0 Gathering support

Change default field name behaviour when exporting to shape file

When exporting model network data to shapefile format, the default export field names generated in the “open data export centre” are currently very awkward. The issue arises because many field names in ICM are longer than ten characters, but shape...
Jason Kulsdom over 1 year ago in InfoWorks ICM / Export Data 2 Under consideration

Bioretention Underdrain Slope / Additional layer Options

Virginia specifications for a bioretention requires the underdrain to have a slope to it, but Infodrainage slope does not allow for this in the SWC bioretention SWC. Also, we sometimes have to place the underdrains in a trench below the storage la...
Jenna Woyner almost 2 years ago in InfoDrainage / Hydrology 2 Already exists

ARR critical storm analysis in Comparison Report

Please update the comparison report feature in InfoDrainage to allow ARR design storms - critical storm per drainage element. We currently cannot compare phases when using ARR storms.
matthew.piggott 9 months ago in InfoDrainage / Reporting 0 For Review

Add an option to 'apply rainfall' directly to river reach objects

Currently a user would need to define a subcatchment to generate runoff for a river reach. This is okay for 1D models but for 1D/2D models, especially 2d runoff models it adds some additional steps for the user. It would be nice for add a 'apply r...
Alex Grist 9 months ago in InfoWorks ICM / River Modeling 2 Under consideration