Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 778

Network Isolation Trace

The Network Isolation Trace functionality identifies regions of a Distribution Network that are isolated from a source of water.
Tony Andrews 8 months ago in Info360 Asset / Product workflows 0 Gathering support

Pipe isolation tracing

The Pipe Isolation Trace functionality can be used to identify the nearest valves to be closed in order to isolate a selected pipe(s). The trace works outwards from selected pipes until the tracing tool reaches a valve node or the extents of the n...
Tony Andrews 8 months ago in Info360 Asset / Product workflows 0 Gathering support

improve print functionality

The print functionality in ICM could be improved very much (printing to PDF files). It takes at the moment a lot of time and even then it is not possible to easily (and flexible) fit a selection to the chose page setup (size) for example. Or fit a...
Richard Wilbrink over 2 years ago in InfoWorks ICM / Printing 1 Gathering support

2D Result Long Profile results comparison

When doing flood study, XPSWMM had a cross-section tool that would show WSEL. While I can use US/DS profiles to compare two scenarions - I want to cut a long section along a 2D channel (and no I am not converting it to River Sections as it defeats...
Guest over 1 year ago in InfoWorks ICM / 2D Flooding 1 Gathering support

Integration with Autodesk Construction Cloud (Build)

Autodesk Construction Cloud, specifically the Build module, is already a fully configurable asset management solution with mobile workflows. Multiple utilities (3+) have liked the day-to-day work order management available in Build and the simplif...
Tim Medearis about 2 years ago in Info360 Asset / Integrations 0 Gathering support

Provide option to allow for several multipliers and use with selection sets

In addition to a global multiplier, sometimes you want to peak certain areas and selection sets with specific peaking factors. WaterCAD allows for this under their calculation options.
Michele Marston over 1 year ago in InfoWater Pro / Operational Modeling 0 Gathering support

Optimize PRV Settings, including flow modulated PRVs

I want a tool that can help define the minimum pressure setting at a PRV to provide required pressure to downstream customers under expected demands. In addition, in cases where I have flow modulated PRV's, I want the tool to provide a curve of pr...
Guest about 4 years ago in InfoWorks WS Pro / Automation 0 Gathering support

4K Screen

Not everything works well with 4K monitors (grips). Let's get real 4K workflow - not just a DPI scaling solution.
Guest about 2 years ago in InfoWorks ICM / Productivity 0 Gathering support

As a planner, I want a single, integrated modelling platform to represent the water supply, sewerage and drainage (1D/2D) system.

Melbourne Water has successfully completed a pilot modelling study using InfoWorks ICM to build a single integrated model to represent the water supply, sewerage and drainage system (including overland flooding) for a proposed redevelopment area (...
Andy Chan about 6 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Speed up interfaces with 2D zones with millions of elements (make it a multicore process)

The interface for large 1D-2D models is very slow. While moving through the geoplan every time it takes about ten seconds to load and show the location. We noticed that in this time only 1 of the 32 CPU is used for 100%. We tried 2 complete differ...
Guest over 5 years ago in InfoWorks ICM / Performance 1 Gathering support