Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 595 of 1442

Add validation for errors causing simulation to fail

If a conduit has a cross section with zero width, the simulation will fail with the following message: "Fatal 37: INTEGRITY FAILURE: geo_setup - invalid conveyance for ABC474.1, section 1". The validation does not catch this error. It would be hel...
Corina Overman about 1 month ago in InfoWorks ICM / Validation 1 For Review

To be removed

To be removed
Oscar Holemans 22 days ago in InfoWorks ICM / API / Exchange 0 For Review
110 VOTE

Support for multiple screens

Would like to be able to work across multiple screens - plan view on one screen and long section/grid/graph on another.
Ann Pugh over 6 years ago in InfoWorks ICM / Productivity 5 Will not implement

Support for ArcEngine Functions for background layers (no x32 bit support)

The current x64 version of ICM cannot use the ArcEngine / ArcGIS Desktop funcionality, in contrast to previous x32 bit versions of ICM. Since only x64 bit version is now supported, this feature cannot be used. It is one of the most important featu...
Elliot Egan over 2 years ago in InfoWorks ICM / GIS Layers 1 In progress

Allow buildings to connect to multiple nodes with specified roof area percentages

In existing urban areas, especially during road reconstruction projects, we often face situations where only part of a roof can be disconnected from the foul system. Currently, in InfoWorks ICM, a building object can only be linked to a single nod...
Coen Maas 5 months ago in InfoWorks ICM / Hydraulics 1 Gathering support

Progress bar to show status of results being downloaded from the cloud

By default, ICM Cloud simulations store results in the cloud. When downloading results to a local results folder, the 'Status' in the 'Job Control' window only displays 'Downloading results' without providing details such as the amount of data dow...
Rahul Raj 4 months ago in InfoWorks ICM / Results 2 Under consideration

2D meshing using Ruby and ICM Exchange

As part of DWMP we are likely to need to create multiple scenarios for each network based on Growth (2035, 2045 etc...). One of the approaches ot the detriment anaylsis will require a 2D approach. Would it be possible to allow meshing from within ...
Jose Pereira over 1 year ago in InfoWorks ICM / API / Exchange 2 Under consideration

Add LA County Modified Rational Method Functionality

It would be beneficial to have the ability to generate hydrographs using LA County's Modified Rational Method, similar to XP-SWMM. This would allow consultants to use ICM on LA County projects.
Andrew Augustine 12 months ago in InfoWorks ICM / Hydrology 3 Gathering support

Connect storage nodes to 2D mesh

Storage nodes allow for a better schematization of large, variable size structures such as pump stations or weirs. They are missing the functionality to connect them to the 2D mesh, so flooding from those locations is not visible. Adding the optio...
Marcel Glasbergen over 1 year ago in InfoWorks ICM / Ponds/Storage 1 Gathering support

Better Hydraulic Profile CAD Export

Utilities for comparing HGLs between scenarios are limited, so sometimes you are forced to export to dwg to compare more directly. The export linework is kind of a mess - no legend, no layer naming. I would request that the linework be exported wi...
Guest 30 days ago in InfoWorks ICM / Export Data 0 For Review