Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 201 of 1442

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith almost 5 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Demand Area Analysis for partially metered areas

Demand Area Analysis was originally intended for networks where the unprofiled demand was unmetered. When domestic (unprofiled) metering became more prevalent Innovyze introduced “Current Average Specific Consumption (l/p/day)” in the calculation ...
Guest over 1 year ago in InfoWorks WS Pro / Productivity 2 For Review

Consistent SHP Export Data Fields for 2D mesh elements in ICM

A simulation result can be exported to SHP files by right clicking the icon and choosing the Export menu. When the result is exported for a specific timestamp, some underlying data fields are not exported such as the elevation and area of a 2D ele...
Miyuki Okuda almost 5 years ago in InfoWorks ICM / Export Data 0 Gathering support

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest about 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists

Scenario assigned 'official' ID numbers within software

I would like for scenario names to be prefixed with a built-in ID number, in the same way that model commits have official version numbers, and wastewater and trade waste profiles have ID numbers. ICM clearly tracks ID numbers behind the scenes, s...
Jason Kulsdom over 3 years ago in InfoWorks ICM / Scenario 1 Gathering support

Export both the result and the underlying property fields

When the model results are displayed on the webpage through Exchange, since the basic properties need to be viewed, the corresponding basic properties of the results need to be exported first, and then the results are matched to the basic properti...
Liu Qiusheng about 5 years ago in InfoWorks ICM / Export Data / Simulations 0 Gathering support

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam almost 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub almost 2 years ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

Consistency in Plots Titles for Simulation and Live Data Plot Reports

Consistency in Plots Titles for Simulation and Live Data Plot Reports In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011” C...
Guest over 5 years ago in InfoWorks WS Pro / Other 0 Gathering support

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ge...
Guest almost 6 years ago in InfoWorks WS Pro / Productivity 0 Gathering support