Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 1067 of 1442

Ability to access databases where Workgroup Data Server and databases don't reside on same server

With the large amounts of data generated it would be beneficial if a supported configuration would be to have a WDS installed on a server but pointing at databases (and solves etc) over the network on a remote storage system (such as NAS). This wo...
Guest over 5 years ago in InfoWorks ICM / Workgroup 0 Gathering support

Remove "Delete simulation" option from "Results Manager"

Within the "Results Manager" window, "Delete time-varying results files" and "Delete all results files" are very useful tools - with this being the go-to method within my team for removing no-longer-needed results files. However, I have never seen...
Jason Kulsdom almost 3 years ago in InfoWorks ICM / Simulations 3 Gathering support

Parallel Computing for Optimising Simulation Times in Massive Network Models

Working with Infoworks WS Pro we have seen that the software never uses more than 2 logical processor without reaching more than 20% of CPU capacity. As a users we would like to take advantage of multi-threaded CPUs to accelerate simulation intens...
Juan Carlos Ortega almost 3 years ago in InfoWorks WS Pro / Cloud Simulations / Engine / Productivity 4 Gathering support

Flood Studies Update: Ireland

Add support for the Met-Eireann DDF Irish Rainfall Data. The IDF data can be downloaded from a website and automatically uploading this data would be a big time-saver for users in Ireland.
Guest over 3 years ago in InfoDrainage 1 Already exists

Retain/Lock dummy MH names

Can we get a function to lock/retain MH numbers, If you have multiple dummy MH's and need to make changes any name you have given to these is lost when renumbering. You then need to go through the whole process again.
Guest over 3 years ago in InfoDrainage 1 Already exists

Include SuDS Maintenance

Add the ability to have a maintenance sheet in the print outs for SuDS structures.
Guest over 3 years ago in InfoDrainage 0 Gathering support

manhole and pipe size files

when I start a new network, the criteria automatically selects my default manhole and pipe size file, can you change it so when importing a file for the first time it selects my standard default files, older versions did select the default file
Guest over 3 years ago in InfoDrainage 1 Gathering support

As a planner, I want a single, integrated modelling platform to represent the water supply, sewerage and drainage (1D/2D) system.

Melbourne Water has successfully completed a pilot modelling study using InfoWorks ICM to build a single integrated model to represent the water supply, sewerage and drainage system (including overland flooding) for a proposed redevelopment area (...
Andy Chan over 6 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Change upstream pipe connections

The ability to reassign the upstream component of a connection would be so useful. You can bulk import stormwater features and connections from AutoCAD but InfoDrainage does not seem to recognise when the connection is from the stormwater feature ...
Chloe Spencer over 1 year ago in InfoDrainage / Other 0 For Review

Enable Reference Graph type "Output from other sources" for Group Graphs

On a single element graph, you can use Reference Graph - Output from other output source(s) to compare results for that element from various scenario runs. This option should also be enabled for Group Graphs on multiple elements.
Grant Clemens about 2 years ago in InfoWater Pro / Productivity 0 Gathering support