Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 1067 of 1442

FEH22 Rainfall via the Exchange

Given the current workload involved in generating FEH22 rainfall data, it would be highly beneficial if this functionality could be made available through the InfoWorks ICM Exchange. This would streamline workflows and significantly reduce manual ...
Sebastian Madrid 6 months ago in InfoWorks ICM / Rainfall 3 Under consideration

Ability to access gauge results when results timestep multiplier is 0

If I am trying to access the gauge results (using obj.gauge_results) for a simulation where the results timestep multiplier has been set to 0, an error is raised (gauge_results - no such field). I should be able to access results for gauged object...
Oscar Holemans 26 days ago in InfoWorks ICM / API / Exchange 0 For Review

Ability to export gauge results to CSV

I would like the ability to export gauge results to CSV, in a similar way that I can export normal results using sim.results_csv_export or sim.results_csv_export_ex.
Oscar Holemans 22 days ago in InfoWorks ICM / API / Exchange 0 For Review

Allow different C-values (runoff coefficients) for major and minor storms

It would be nice to have an input for different C-values (runoff coefficients) for various storm events. In CO we have different coefficients based on the storm event which contributes to the flow calculations for the Rational Method. Currently yo...
Steve Batchelder 22 days ago in InfoDrainage 0 For Review

‼️Improved Snapping and Placement Tools ‼️

It would be great to have additional snapping options—simple ones like end, midpoint, and intersection—to make placement more accurate. Currently, snapping is inconsistent and often doesn’t engage when expected. It would also help to clearly show ...
Guest about 1 month ago in InfoDrainage 1 For Review

🔥Optimise Pipe Network Design by Updating Upstream Pipes Slopes in Profile View ‼️

💧 Add a feature that automatically selects all upstream pipes from a chosen junction and updates them to a specified slope. This would streamline optimisation by removing the need to manually identify and adjust each pipe segment. It improves desi...
Guest about 1 month ago in InfoDrainage 0 For Review

Improve help documentation for Screen units

The InfoWorks ICM help file for screen units, contains an old illustration of a bar screen with an annotation to sum gaps between the bars to calculate spacing. This illustration is confusing as the help file for screens was recently changed to sp...
Tom Walker about 2 months ago in InfoWorks ICM / Hydraulics 0 For Review

Custom Label Text "Automatic color" should WCAG contrast vs. label background label/flag colors

Text would automatically contrast against custom label background colors or flag colors, whilst meeting WCAG requirements, so that labels are more readable.
Guest 9 days ago in InfoWorks ICM / Labels 0 For Review

Combining 2 or more InfoDrainage Models

There is no easy way to combine / merge two InfoDrainage models. Projects of a large scale are often split up into different sites for smaller teams to analyze. When trying to analyze the entire site as a whole, these models need to be merged into...
TAARIQ HANSROD 12 months ago in InfoDrainage / Other 13 In progress

Go to a node or link from a graph

It would be useful if you could simply Right-Click a graph and there be an option to "Go to node/link" to quickly go to it in the geoplan.
William Tracey 4 months ago in InfoWorks WS Pro / Other 0 Gathering support