Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 143 of 1370

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam over 1 year ago in InfoWorks WS Pro / Productivity 2 Gathering support

Specify number of demands

I almost never need to use all 10 demand fields in InfoWater. The ability to specify the number of demand fields needed would save space in the demand DB table and in the Model Explorer window and make viewing these windows easier.
Colin Ricks almost 6 years ago in InfoWater Pro / Other 3 Under consideration

Allow Customized Reports to Also Include Standard and Fireflow Results - Just Have One Result Table

Currently all model element information and results are separated between the DB Editor, Customizable Report, and Output Report/Graph. This is confusing and hard to export specific information together without having to combine it later in Excel o...
Joe Lawrence over 4 years ago in InfoWater Pro 1 Gathering support

Include an "excluded search nodes" warning in fireflow output table

When the design pressure exceeds the static pressure at a particular node, that node will be excluded from a design fireflow model run. The output table should include a banner at the top listing the excluded nodes, as these can make a big differe...
Guest over 4 years ago in InfoWater Pro / Engine 0 In progress

inlet riser option for tank

Have an option to specify an Inlet Riser Pipe for the tank element. This would hold the fill head at a constant, set at the riser pipe elevation, but allow the tank discharge head vary with the tank level.
Guest almost 5 years ago in InfoWater Pro / Engine 0 Gathering support

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest almost 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ge...
Guest over 5 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Isolation Scenario Using Dummy Valves Which Do Not Split Pipes

Can you put a valve on top of a pipe (not splitting the pipe) and then it closes the section? And then anything enclosed to these multiple valves will be isolated? This is going to be useful for modelling of isolation scenarios
Guest almost 2 years ago in InfoWater Pro / Operational Modeling 3 Gathering support

Improvements to "Edit Attributes" table

The "Edit Attributes" window (accessed by using the "Edit Selection" or "Edit Domain" buttons) is a useful table to quickly view and edit all the physical information for each facility type together. However, it has some useability issues that som...
Colin Ricks almost 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Enable re-runs for selected scenarios

With the new Reserved Run workflow I can re-run simulations with my latest changes quickly without needing to commit. However if I'm using scenarios in the run, WS Pro re-runs all scenarios every time, even if there weren't any changes. I want an ...
Nathan Gerdts about 2 years ago in InfoWorks WS Pro / Productivity 0 Gathering support