Variable baseflow

(Could also be considered hydraulics) On large scale projects where we may have limited information and funding, we assume baseflow values through an upstream point inflow. It would be beneficial to have a variable baseflow input per design storm....
Jess Ewing almost 2 years ago in InfoDrainage / Hydrology 1 Gathering support

Add the ability to duplicate connections between phases

Currently it is possible to duplicate stand-alone objects to different phases. Connections are not included in this. To duplicate connections to a different phase, the engineer must export the connections to a different format then re-import those...
Guest about 1 year ago in InfoDrainage / Productivity 1 Gathering support

Schematic for Dry Wells

When adding a dry well, it would be useful to provide some labelled images like those available for other stormwater controls to clarify what the properties are refering to.
Midori Patterson almost 2 years ago in InfoDrainage / Visualization 1 Gathering support

Limit the chamber sizing calculator to 200 chambers

The chamber size calculator will add any number of chambers necessary, however, the model will not validate if the number of chambers exceeds 200. It would be better to not allow the calculator to exceed the validation limit.
Daniel'le DeVoss about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Adding a "Default" selection box when Outputting information

To ensure the information output is not too much or too little, it would be good to have a default set of information that can assist LLFAs in reviewing print outs. This came up during a webinar I attended about auditing models. Sometimes you can ...
Guest about 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Increase the limit of Chambers allowed

Currently in the 2025.2 version I am running, the number of Chambers for subsurface storage/detention allowed is 200. The sizing calculator says I need more and wouldn't validate the model. Would be nice to have a higher limit.
Bryan Forrest about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest about 1 year ago in InfoDrainage / Productivity 0 For Review

Parallel Computing for Optimising Simulation Times in Massive Network Models

Working with Infoworks WS Pro we have seen that the software never uses more than 2 logical processor without reaching more than 20% of CPU capacity. As a users we would like to take advantage of multi-threaded CPUs to accelerate simulation intens...
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Cloud Simulations / Engine / Productivity 4 Gathering support

Display multiple networks in 3D.

In order to aid the layout design of drainage networks, it would be useful to see both foul and surface water sewer networks simultaneously, in the 3D view. This would allow designers to see the clearance between pipes and chambers and have piece ...
Guest almost 2 years ago in InfoDrainage / Visualization 3 Already exists

Multi-fireflow in WS Pro

Currently, the available built-in fireflow options in WS Pro run for individual nodes/hydrants as if no hydrant in the system is open. Adding the ability to run multiple hydrants that are opened simultaneously will be very useful.
Guest about 5 years ago in InfoWorks WS Pro / Engine 0 Gathering support