Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 181 of 1370

Create channel section lines from points

Survey data for river sections is often delivered as point data. To be able to create a model in ICM from this it needs to be converted into a line. This functionality was available in RS.
Guest almost 3 years ago in InfoWorks ICM / Productivity / River Modeling 0 Gathering support

Remove Need to Validate When Changing Background Layers

Suggest that a network not need to validated or show that it was edited (red circle) for only switching on/off a background (e.g., aerial)layer would be appreciated. Keeping scenarios straight is tough enough w/out the additional heart attack when...
Guest about 4 years ago in InfoWorks ICM / Productivity / Validation 3 Will not implement

Enable running stats templates via ruby script

We are running more and more simulations via ruby script but then have to manually run the stats reports, then export the results this is very time consuming. It would be very useful to be able to run the previously created stats templates from th...
Graham Millar almost 2 years ago in InfoWorks ICM / API / Exchange 0 Gathering support

Save toolbar and screen configurations and locations

I run InfoWorks on my laptop, and have an external monitor. I find I'm often searching for toolbar buttons because switching between the two monitors of different sizes re-configures the locations of the various toolbars and screens. For example,...
Dave White about 6 years ago in InfoWorks ICM / Productivity 4 Gathering support

Validation as a background task

Validation as a background task so UI isn't locked.
Guest about 6 years ago in InfoWorks ICM / Productivity / Validation 2 Will not implement

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body almost 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Show individual vertex points in the geoplan at all zooms

Vertices are only shown in the geoplan when zoomed in. It would be useful to see these at all zoom levels for cross sections and bank lines.
Guest almost 3 years ago in InfoWorks ICM / Productivity 0 Gathering support

Use tracers for water on mesh elements

Our clients are more and more trying to figure out if damage to a property is caused by water from the public area (which is the responsibility of the client) or from private areas (which is not). When rainfall on mesh can pick up a tracer (eg. fr...
Marcel Glasbergen over 3 years ago in InfoWorks ICM / 2D Flooding / Visualization / Water Quality 1 Gathering support

It will great if we can control the display of the labels in ICM to have a better visualization.

For example : the possiblity of changing the precision in the labels (the decimal number of the value )
Guest almost 4 years ago in InfoWorks ICM / Visualization 3 Gathering support