Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 150 of 1442

Liquid filled/Flooded drainage network

Liquid filled/Flooded drainage network- the system should be required to design flooded drainage network i.e. drainage pipe should be always filled with liquid for entire length up to the discharge point. Like a surcharge up to manhole cover (liqu...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Multiple return period hydrograph

Currently, InfoDrainage restricts each hydrograph to a single return period, which creates inefficiencies when analyzing stormwater systems across multiple design storms. To accommodate analyses for 2-, 10-, and 100-year events, for example, users...
Guest 11 months ago in InfoDrainage / Hydrology 0 For Review

Modelling intermediate check dams and weirs in open channels including ponds ands swales

Currently, InfoDrainage only allows modeling of check dams or weirs at outlets. For open channels with multiple intermediate check dams, users must split the channel into sections, each with its own outfall defined. A more accurate feature allowin...
Dilraj KT over 2 years ago in InfoDrainage / Hydraulics 1 Gathering support

Button: Apply to all phases

To each of the build screens, next to "apply", add another button, "apply to all phases". This would save a lot of time when making tweaks to models for which more than one phase is being run (which is most models)
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Export run results to csv: timestep options

When exporting run results to csv, it would be useful to select a timeframe you wish to export (excluding for instance the initial conditions that haven't settled into a level that makes sense). Also exporting at a different timestep than the one ...
Guest about 3 years ago in InfoWorks ICM / Export Data / Results 0 Gathering support

Extra Results Outputs for some features in ICM

Hi there - Doing some work for a client I found the following limitations in results exports from Infoworks ICM: 2D Base Linear Structure: ls_underflow and ls_overflow results variables cannot have a summary of peak value exported by CSV or SHP. T...
Guest 11 months ago in InfoWorks ICM / Results 0 For Review

HEC-22 Inlet reporting

The "Export HEC-22 Result to Excel" button in the calculator only includes results. Looking at flexible reporting, the HEC-22 data is only input, so I then have to use the results data from the calculator and the input data from flexible reporting...
Guest 12 months ago in InfoDrainage / Hydraulics 1 Under consideration

Automatically clean completed items from Job Control window

When using InfoWorks ICM across a workgroup server, all the simulations are visible by all users in the job control window. To keep the list manageable this requires each individual user to remember to click remove completed jobs regularly. As lon...
Tom Walker almost 2 years ago in InfoWorks ICM / Results 2 Already exists

Bioretention Underdrain Slope / Additional layer Options

Virginia specifications for a bioretention requires the underdrain to have a slope to it, but Infodrainage slope does not allow for this in the SWC bioretention SWC. Also, we sometimes have to place the underdrains in a trench below the storage la...
Jenna Woyner about 2 years ago in InfoDrainage / Hydrology 2 Already exists

Allow for the running of statistics templates and generation of grid reports such as RPA and worst case using ICM Exchange

No description provided
Guest almost 6 years ago in InfoWorks ICM / API / Exchange / Productivity / Results 0 Gathering support