Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 143 of 1370

Delete Vertex in Pipe

I would like to be able to remove vertices from a pipe. Currently, you can only move the vertices or redraw the pipe. This process takes a while on big models and makes the distribution network more complicated.
Guest 6 months ago in InfoWater Pro / Other 0 For Review

Change formatting of '2D level boundary below ground level' in the timestep log

Other warnings such as manhole shaft/chamber area occur with only one line of text with the '(and possibly others)' text. Could something similar be introduced for the '2D level boundary below ground level' warning in the timestep log? This warnin...
Tom Newman 9 months ago in InfoWorks ICM / Reporting 0 For Review

Automate the "geodatabase rebuild" troubleshooting process

When models start to behave erratically or sluggish, a common recommendation is to "rebuild the model geodatabase" as shown here: https://www.autodesk.com/support/technical/article/caas/sfdcarticles/sfdcarticles/Troubelshoot-Map-Issues.html It wou...
Grant Clemens over 1 year ago in InfoWater Pro / Automation 0 Gathering support

Could we add a preference to disable the popup to accept the most recent run data?

The popup is confusing, and we don't see a point in not accepting the latest run results.
Deb Smith 10 months ago in InfoWater Pro / Productivity 2 Gathering support

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg over 1 year ago in InfoWater Pro / Other / Productivity 0 Gathering support

Bank line export for inline banks

If you export ICM results, the inline banks are now exported as the lines between the 2D outfall and the node that determines the 1D level. This is a meaningless object, whereas exporting the bank line geometry that is attached to it makes it much...
Marcel Glasbergen about 1 year ago in InfoWorks ICM / Reporting 1 Gathering support

Export manager scope should include Selection Sets

Export manager "Element Scope" currently only allows All, Domain, and User selection for the scope of the elements to export. A combo box with the list of selection sets would be useful and likely easy to implement.
Colin Ricks over 1 year ago in InfoWater Pro / Productivity 0 Gathering support

Pressure Relief Valve

Which valve, if any, would represent a pressure relief valve? Where the pressure on the upstream is not allowed to exceed a certain psi. If it exceeds the specified pressure on the upstream side the valve will open.
Guest 11 months ago in InfoWater Pro / Operational Modeling 2 For Review

Create an option in the Domain Manager to add elements by ID

The workflow to add a list of element IDs to the domain is too complicated. Simplify this by creating a new option in the Domain Manager, it could just open a table where you set the number of rows and paste IDs from a list/table copied from a pro...
Grant Clemens almost 2 years ago in InfoWater Pro / Productivity 2 Under consideration

Add button for show/hide inactive elements.

I frequently turn the inactive elements on & off in InfoWater Pro. Right now, this requires multiple mouse clicks & is inefficient. A button added to the ribbon and/or Model Explorer would be ideal.
Guest almost 2 years ago in InfoWater Pro / Productivity 0 Gathering support