Show individual vertex points in the geoplan at all zooms

Vertices are only shown in the geoplan when zoomed in. It would be useful to see these at all zoom levels for cross sections and bank lines.
Guest almost 2 years ago in InfoWorks ICM / Productivity 0 Gathering support

Long Section to AutoCAD DWG

As the Alternative Results in the Long Section are bogus (they are not Level or height above datum) instead are displayed as depth above invert) - we need a better way to compare existing simulation results and proposed results in a long section. ...
Guest 4 months ago in InfoWorks ICM / Productivity 0 For Review

Save toolbar and screen configurations and locations

I run InfoWorks on my laptop, and have an external monitor. I find I'm often searching for toolbar buttons because switching between the two monitors of different sizes re-configures the locations of the various toolbars and screens. For example,...
Dave White over 5 years ago in InfoWorks ICM / Productivity 4 Gathering support

Give a warning when copying between networks with different user defined defaults

when copying for example conduits between networks with flags #D for headloss and roughness, the values are adapted to the user defined values in the new network. This can be confusing.
Guest almost 2 years ago in InfoWorks ICM / Flags / Import data / Productivity 0 Gathering support

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest almost 2 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Validation as a background task

Validation as a background task so UI isn't locked.
Guest over 5 years ago in InfoWorks ICM / Productivity / Validation 2 Will not implement

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh over 5 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Be able to create selection lists using ICM Exchange from a list of Node or link IDs

No description provided
Guest over 4 years ago in InfoWorks ICM / API / Exchange / Productivity 1 Gathering support

UX: Allow decimal values without a leading zero

When adjusting values - you need to enter a leading zero to adjust by non-integer values. It would be nice to simply type '.5' if you need to lower by half a unit. The anticipation and early validation of the number is needless to toss a dialog bo...
Matt Anderson 7 months ago in InfoWorks ICM / Productivity 2 Gathering support

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body about 5 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support