upgrade the embedded Ruby interpreter

It is a pity that there is no way to upgrade the embedded Ruby interpreter. Unfortunately, that old version is not compatible with many of the useful Ruby Gems – severely limiting its usefulness. Do you have plans to include a more recent version ...
Guest 4 months ago in InfoWorks ICM / API / Exchange 2 Under consideration

Show individual vertex points in the geoplan at all zooms

Vertices are only shown in the geoplan when zoomed in. It would be useful to see these at all zoom levels for cross sections and bank lines.
Guest about 2 years ago in InfoWorks ICM / Productivity 0 Gathering support

Select and deselect all scenarios button for validation

Add a deselect and select all button for scenarios when doing a network validation. It gets frustrating when there are lots of scenarios and you only want to validate one of them.
Andrew Sherson 3 months ago in InfoWorks ICM / Validation 1 For Review

Save toolbar and screen configurations and locations

I run InfoWorks on my laptop, and have an external monitor. I find I'm often searching for toolbar buttons because switching between the two monitors of different sizes re-configures the locations of the various toolbars and screens. For example,...
Dave White over 5 years ago in InfoWorks ICM / Productivity 4 Gathering support

Validation as a background task

Validation as a background task so UI isn't locked.
Guest over 5 years ago in InfoWorks ICM / Productivity / Validation 2 Will not implement

Option to change selection method to avoid the Multiple Selection dialogue

Often when I'm working on the GeoPlan, I want to select, identify, or label multiple nodes or links. Every time I click on one that intersects with a sub catchment though, I have to deal with the multiple selection dialogue and choose which featur...
Guest 3 months ago in InfoWorks ICM / Productivity 1 For Review

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh over 5 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Give a warning when copying between networks with different user defined defaults

when copying for example conduits between networks with flags #D for headloss and roughness, the values are adapted to the user defined values in the new network. This can be confusing.
Guest about 2 years ago in InfoWorks ICM / Flags / Import data / Productivity 0 Gathering support

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest about 2 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body over 5 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support