Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Productivity

Showing 135 of 1372

Save toolbar and screen configurations and locations

I run InfoWorks on my laptop, and have an external monitor. I find I'm often searching for toolbar buttons because switching between the two monitors of different sizes re-configures the locations of the various toolbars and screens. For example,...
Dave White about 6 years ago in InfoWorks ICM / Productivity 4 Gathering support

Validation as a background task

Validation as a background task so UI isn't locked.
Guest about 6 years ago in InfoWorks ICM / Productivity / Validation 2 Will not implement

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Show individual vertex points in the geoplan at all zooms

Vertices are only shown in the geoplan when zoomed in. It would be useful to see these at all zoom levels for cross sections and bank lines.
Guest over 2 years ago in InfoWorks ICM / Productivity 0 Gathering support

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body almost 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Remember/Fix Toolbar positions

When moving window from fullscreen to half/split-screen all the toolbars are moved to fit half screen width. When returning to fullscreen the toolbars remain in their split-screen positions. This makes finding tools challenging, takes up more scre...
Matthew Paul about 1 year ago in InfoWorks ICM / Productivity 1 Under consideration

Allow grid view produced by a SQL script to interact with GeoPlan

Allow grid view produced by a SQL script to interact with GeoPlan so users can right click on SQL elements and zoom to/navigate to the selection on the GeoPlan.
Karen Chu 7 months ago in InfoWorks ICM / SQL 4 Gathering support

Addition of error message

When creating a mesh for the 2D zone of Clip meshing, if a single infiltration zone straddles multiple 2D zones, the meshing process succeeds, but an E2225 message occurs in validation. I understand that this message occurs because the infiltratio...
Nami Ikarashi 8 months ago in InfoWorks ICM / Validation 0 For Review

Be able to create selection lists using ICM Exchange from a list of Node or link IDs

No description provided
Guest over 5 years ago in InfoWorks ICM / API / Exchange / Productivity 1 Gathering support

reduce validation time of models with infiltration zones

When using rainfall onto mesh in InfoWorks ICM, we often rely on infiltration zones to represent different land uses and their runoff characteristics (e.g., impermeable surfaces, grass, etc.). To ensure full coverage and avoid gaps or "donuts" in ...
Coen Maas 4 months ago in InfoWorks ICM / Validation 2 For Review