Ability to change mesh ground level values without remeshing

Mesh zones and Mesh level zones are available to change ground level values for the contained 2D meshes, but it will require re-meshing. If we can select 2D meshes by the polygon selection or selection tool and change the mesh elevation values wit...
Miyuki Okuda 5 months ago in InfoWorks ICM / Mesh 1 Already exists

Automatically clean completed items from Job Control window

When using InfoWorks ICM across a workgroup server, all the simulations are visible by all users in the job control window. To keep the list manageable this requires each individual user to remember to click remove completed jobs regularly. As lon...
Tom Walker 8 months ago in InfoWorks ICM / Results 1 Already exists

flash/locate

As in Arcmap, please include the ability to flash a selected object or via the object search. This is really useful, especially in large models, to quickly see where features are in relation to one another or in the context of the whole network.
Chris Brown 8 months ago in InfoWorks ICM / Visualization 3 Already exists

Bioretention Underdrain Slope / Additional layer Options

Virginia specifications for a bioretention requires the underdrain to have a slope to it, but Infodrainage slope does not allow for this in the SWC bioretention SWC. Also, we sometimes have to place the underdrains in a trench below the storage la...
Jenna Woyner 12 months ago in InfoDrainage / Hydrology 2 Already exists

3D View of flooded manholes

The extent of flooding in the 3D view should be proportional to the volume of flooding of that manhole. At the moment it shows the same extent of flooding whether it's 0.1m3 or 100m3. Would make visualisation the extent and location of flooding on...
Guest 8 months ago in InfoDrainage / Visualization 1 Already exists

Run same return period with multiple climate change allowances

When running the simulation wizard I would like to be able to run the same return period with multiple climate change allowances to enable a single analysis covering all scenarios. This will avoid needing to adjust inputs & rerunning the netwo...
Guest over 2 years ago in InfoDrainage 1 Already exists

True Ground Profile on Long Section Exports

It would be very useful if there was a way for the true ground profile to also be exported on long sections. Currently, when exporting long sections from microdrainage, the true ground levels are only shown at manhole locations and a straight line...
Guest over 2 years ago in InfoDrainage 2 Already exists

Restore appropriate local folder settings after browsing a different database

In recent versions, local root settings are not restored when a different database is selected. In older versions, I think that local root settings are changed automatically and correctly depending on which database is open. However, recently, whe...
Miyuki Okuda 8 months ago in InfoWorks ICM / Workgroup 1 Already exists

Manhole Schedule Numbering

For MH tables and report outputs, it would be good to have an option to report chronologically, e.g. 1-30. I understand it numbers them on the first Manhole built in the model however I think it would make more sense to go from shallowest to deep...
Guest over 2 years ago in InfoDrainage 3 Already exists

Add a Brownfield Runoff tool under Preliminary Sizing > Calculators in the ribbon