Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks ICM

Showing 4

Ability to change mesh ground level values without remeshing

Mesh zones and Mesh level zones are available to change ground level values for the contained 2D meshes, but it will require re-meshing. If we can select 2D meshes by the polygon selection or selection tool and change the mesh elevation values wit...
Miyuki Okuda 5 months ago in InfoWorks ICM / Mesh 1 Already exists

Automatically clean completed items from Job Control window

When using InfoWorks ICM across a workgroup server, all the simulations are visible by all users in the job control window. To keep the list manageable this requires each individual user to remember to click remove completed jobs regularly. As lon...
Tom Walker 8 months ago in InfoWorks ICM / Results 1 Already exists

Ability to toggle on and off if 'user defined properties' automatically open when opening an objects properties

I am currently in the process of digitising old IAS plans within ICM. Every time I click on an object to assign it a system and surface within the User Defined Properties, I have to click the + symbol to open the properties. This has to be a very ...
Patrick Fox 9 months ago in InfoWorks ICM / Other 7 Already exists

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward about 1 year ago in InfoWorks ICM / Results 2 Already exists