Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Triggers - Automation

Workflow automation in Info360 Asset. Take any process or analytic and set triggers to kick it off along with other processes downstream Example: New CCTV inspection approved Triggers Risk model run Triggers Rehab tree run Triggers New reha...
Mike Maylone over 3 years ago in Info360 Asset / Product workflows 0 On roadmap

Sort selection sets/ re-order them

Would be very useful if you could either sort selection set orders or move selections up or down the list. This would make it much faster to find the selection set you want in a large list (e.g. DMA selection sets in alphabetical order)
Duncan Allen about 6 years ago in InfoWorks WS Pro 1 Gathering support

Drain nodes connected to 2d domain representing road gullies to 1D pipe network without digitised connection

Often datasets of road gullies are only in point format and lack details on the connections to the surface water sewer network. A function to allow 1D nodes representing road gullies (which are are connected to the 2D domain with a head discharge ...
Guest over 2 years ago in InfoWorks ICM / Inlets 0 Gathering support

Apply rain gauge boundaries to multiple rainfall events

I would like to load rain gauge boundaries to multiple rainfall events at once. I have had to import rainfall profiles from .csv files and I have lots of durations and return periods. Saving the rain gauge boundaries to each file is time consuming...
Guest about 6 years ago in InfoWorks ICM / Rainfall 0 Gathering support

Application of design storms in ICMLive

We'd like to be able to predefine some design storms in ICMLive (note that this is NOT the same as design rainfall in ICM). The idea is that we'd have these storms that could be optionally applied by operators to see the likely effect of a rainfal...
Richard Body about 6 years ago in InfoWorks ICM / Live Modeling / Rainfall 0 Gathering support

Work Order Close & Follow Up

No description provided
Mike Maylone over 3 years ago in Info360 Asset / Work Management 0 Under consideration

When Survey Length is Different than pipe length, do not give a warning unless it is larger than 5ft difference.

Many inspections end up with warnings when this very common issue comes up. Most of the time survey length and pipe length will be different because the GIS is not 100% perfect.
Guest over 3 years ago in Info360 Asset / Inspection & Media Management Workflows 1 Gathering support

Compare WWG and TWG files

A tool to compare different WWG files and TWG files and report on the differences, similar to the Compare functionality for Networks.
Guest over 3 years ago in InfoWorks ICM / Import data 1 Gathering support

Exclude specific elements from Numbering Scheme (flow paths, manholes, simple junctions, etc).

Be able to have only manholes in the manhole schedule, without any missing manhole numbers. Junctions can be named separately and not included. Enable large sites with multiple areas to have their different areas named a different way easier.
Guest over 2 years ago in InfoDrainage / Auditing / Reviewing 2 Gathering support

Structure flow mode reported in the results

Sometimes when evaluating results at structures we see strange results that require investigation; invariably we find out that this is because the flow mode has changed. (e.g. from free to drowned). It would be very helpful if the ICM results were...
Richard Body about 6 years ago in InfoWorks ICM / Grids / Reporting / Results 0 Gathering support