Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 394 of 1370

Liquid filled/Flooded drainage network

Liquid filled/Flooded drainage network- the system should be required to design flooded drainage network i.e. drainage pipe should be always filled with liquid for entire length up to the discharge point. Like a surcharge up to manhole cover (liqu...
Guest about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Labeling manhole and pipe IDs in the Map

It makes it easier to QAQC data, or simply determine which asset it being viewed in the Map.
Martha Nunez about 2 years ago in Info360 Asset / Data Management 3 On roadmap

Allow CCTV Inspections to be associated to a pipe/culvert when PLR and asset IDs match but no manhole IDs are provided in the CCTV inspection

Allow inspections to be imported WITHOUT (i.e. missing) manhole IDs but still provide the association to the asset via the PLR if a corresponding pipe asset has the same asset ID. In the situation where there are no manhole IDs provided then I360A...
Tony Andrews over 1 year ago in Info360 Asset 0 Gathering support

Comparison of total length of rehab methods vs total pipe length

Similar to 'Comparison of total length of defects vs total pipe length' however, rehab methods can be assigned to multiple defects. For example the rehab method 'lining' can be assigned to defect codes CC, CL, FM, etc. the total length of a rehab ...
Martha Nunez about 1 year ago in Info360 Asset 1 Gathering support

Button: Apply to all phases

To each of the build screens, next to "apply", add another button, "apply to all phases". This would save a lot of time when making tweaks to models for which more than one phase is being run (which is most models)
Guest about 1 year ago in InfoDrainage / Hydraulics 0 For Review

User owned templates that can be shared across projects

With this feature, a user could save an already created risk or rehab analysis as template that they could utilize in other projects. This would save consultants and resellers a large amount of time from conducting repetitive processes.
Guest over 1 year ago in Info360 Asset / Product workflows 1 On roadmap

Pipe names missing in export from Civil3D

When exporting pipes from Civil3D to Infodrainage, the pipe names keep reverting to the autogenerated names given when pipe is created in Civil3D even though they were renamed in Civil3D.
Jenna Woyner almost 2 years ago in InfoDrainage / Civil3D Integration 1 Under consideration

Go To button to zoom to a certain pipe from the Connection table

In Civil 3D you can zoom to/select a pipe from the pipe table. It is very difficult to find specific pipes in InfoDrainage.
Daniel'le DeVoss 9 months ago in InfoDrainage / Auditing / Reviewing 0 For Review

Level Soffits in pipe network.

Although you can select Level Soffits in the Network Wizard, if you make a change in the manhole depth for example, the pipes in the network will return to invert level, which means that you will have to readjust them manually.
Konstantinos Koutroulis almost 2 years ago in InfoDrainage / Hydraulics 1 In progress

Allow all uploaded fields as accessible for risk analysis

The risk analysis by attribute can only support a limited number of pre-configured fields. Users might have additional fields they want to include in their risk analysis (see example of IAP risk compared to Info360 Asset dropdown). Right now, this...
Tim Medearis over 1 year ago in Info360 Asset / Data Editing 1 In progress