Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 254

Weir coefficients

Expand the allowable range of weir discharge coefficients in InfoDrainage and provide an optional depth–coefficient user defined table to improve modeling flexibility and accuracy. Weir discharge coefficients (English units) typically range betwee...
Guest 4 months ago in InfoDrainage / Hydraulics 0 For Review

HEC-22 Inlet reporting

The "Export HEC-22 Result to Excel" button in the calculator only includes results. Looking at flexible reporting, the HEC-22 data is only input, so I then have to use the results data from the calculator and the input data from flexible reporting...
Guest 8 months ago in InfoDrainage / Hydraulics 1 For Review

Liquid filled/Flooded drainage network

Liquid filled/Flooded drainage network- the system should be required to design flooded drainage network i.e. drainage pipe should be always filled with liquid for entire length up to the discharge point. Like a surcharge up to manhole cover (liqu...
Guest about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Export functionality for SWMM objects in database tree

Be able to right-click on SWMM objects (SWMM time patterns, SWMM climatology, SWMM pollutograph) and export to CSV as you can with InfoWorks objects.
Guest 8 months ago in InfoWorks ICM / Export Data 1 For Review

Button: Apply to all phases

To each of the build screens, next to "apply", add another button, "apply to all phases". This would save a lot of time when making tweaks to models for which more than one phase is being run (which is most models)
Guest about 1 year ago in InfoDrainage / Hydraulics 0 For Review

reduce validation time of models with infiltration zones

When using rainfall onto mesh in InfoWorks ICM, we often rely on infiltration zones to represent different land uses and their runoff characteristics (e.g., impermeable surfaces, grass, etc.). To ensure full coverage and avoid gaps or "donuts" in ...
Coen Maas 4 months ago in InfoWorks ICM / Validation 2 For Review

Pop out windows for tabs

This would be useful so then one would be able to view multiple long-sections and view the map at the same time on different screens, rather than being limited to one tab at a time.
Guest 4 months ago in InfoWorks ICM / Visualization 1 For Review

Go To button to zoom to a certain pipe from the Connection table

In Civil 3D you can zoom to/select a pipe from the pipe table. It is very difficult to find specific pipes in InfoDrainage.
Daniel'le DeVoss 9 months ago in InfoDrainage / Auditing / Reviewing 0 For Review

Calculating and adding the Froude number to storm table output

Many municipalities and utilities want to maintain subcritical flow in the storm sewer system and avoid hydraulic jumps. The Froude number is used to establish subcritical vs. supercritical flow.
Guest about 1 year ago in InfoDrainage / Reporting 2 For Review

NOAA Durations

InfoDrainage supports only a limited subset of NOAA Atlas 14 storm durations: 360 minutes (6 hours), 720 minutes (12 hours), 1440 minutes (24 hours), and 5760 minutes (4 days). However, NOAA Atlas 14 provides a broader range of precipitation durat...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review