Skip to Main Content
Autodesk
Status Gathering support
Categories Asset Management
Created by Guest
Created on Jan 9, 2020

As an organization, we would like the ability to choose an alternative final risk calculation method.

So, InfoAsset Planner currently only provides the user one way of calculating a final risk score from chosen COFs and LOFs, and that is to sum the scores from all that are included in that risk model. It would great if the user could choose the maximum score from all COFs or LOFs used in the particular risk model. Further, a button that reports the source of the score would be helpful in tracking and documenting the source of that dominant COF/LOF.
  • Attach files
  • Guest
    Reply
    |
    Aug 14, 2021
    Need help to make the major shift to a new ERP?, Nevas Technologies can help support your current Microsoft Dynamics NAV Environment irrespective of the version that you are on. We provide Functional, Technical, Production support and Infrastructure (Server Maintenance, Finetuning, and so on…) services for your current Microsoft Dynamics Navision application. We also provide upgrade services of your old MS Navision version to the latest Dynamics Navision 2016/2017/2018 versions if you are not ready to upgrade to Dynamics 365 Business Central or Unified Operations. https://www.nevastech.com/solutions/microsoft-dynamics-erp/microsoft-dynamics-nav/dynamics-nav-support
  • Guest
    Reply
    |
    Dec 15, 2020
    Are you looking for a method to safeguard your system from potential internet and offline threats? If your answer is yes, then you have to pay a free of cost visit to http://go-officecom.com || http://sitemcafee.com || https://smnorton.com
  • Guest
    Reply
    |
    Sep 15, 2020
    Indeed, It is a very good idea. Selecting all COFs & LOFs would be a great addition in the features just like I have on a website named https://bestseo.com.pk
  • Guest
    Reply
    |
    Sep 11, 2020
    hi, Infrastructure Engineer's roles include being responsible for designing, building, implementing and maintaining the IT infrastructure using the latest technology. https://www.fieldengineer.com/skills/what-is-an-infrastructure-engineer
  • Bradley Nissley
    Reply
    |
    Jan 15, 2020
    Hello Chris, I've recently been working on a similar problem where the integrated risk score is not as "linear" as the COF or LOF wizard will allow. I was pointed towards Data Miner (Operation Center/Data Miner) which allows a bit more customization. I'm still not 100% sure it will do what I need it to do but might be worth having a look if you get the chance. For my recent example I needed to calculate an aggregate COF from more than two COFs. In Data Miner I created a Join block between the two COFs and an output that calculated a Select Case: (CASE WHEN COF1 + COF2 >= 5 THEN 5 WHEN COF1 + COF2 = 0 THEN 1 ELSE COF1 + COF2 END). That output is put through to another Join block with COF3 through to another Join block with COF4 et cetera. My initial reaction is that I would like to be able to calculate COFs, LOFs and Risks as a multi=parameter formula or even directly with SQLite (perhaps as an advanced option in the wizard). If Data Miner doesn't do what I need I'll put it through as a feature request. https://help.innovyze.com/display/infoassetplanner/Data+Miner Kind Regards, Brad